A foundation treatment and high filling technology, which is applied in infrastructure engineering, soil protection, construction, etc., can solve the problems of long drainage consolidation period, filling slippage and subsidence, heavy tasks, etc. The method is practical and the effect is obvious Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The object of the present invention is to provide a treatment method for high fill foundation in deep silt area, which can realize fast backfill of high fill and fast consolidation of deep silt area. Its main process flow is:
[0024] Base surface cleaning→drainage channel burial→sand layer filling→sand layer compaction→insert drainage board→bottom filling→bottom dynamic compaction→second layer filling→second layer dynamic compaction→‥‥‥→top filling→ The top layer is strongly rammed and the surface layer is fully rammed.
[0025] The specific implementation method steps are as follows:
[0026] 1. Base table cleanup. Remove surface debris and drain water.
[0027] 2. Drainage channel buried. According to the terrain of the site, blind ditches 7, water collection wells and water pumps 8 are buried in different areas; in the subsequent construction process, the water collection wells are kept pumping until the ground treatment reaches the standard. The vertical an...
PUM