Abutment body extraversion reinforcement method for U-shaped bridge abutment
An abutment and U-shaped technology, which is applied in the field of the camber reinforcement of the U-shaped abutment, can solve the problems of not being able to guarantee complete effectiveness, failing to eliminate soil side pressure, etc., achieving high strength and avoiding the effect of jumping at the bridge head.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0015] Such as figure 1 , figure 2 As shown, the abutment camber reinforcement method of U-shaped abutment of the present invention comprises the following steps:
[0016] (1) Dig out the road surface and boards within the scope of the two side walls of U-shaped abutment 1 (not shown in the figure);
[0017] (2) Excavate the fill 2 in the U-shaped abutment 1, and fill up the pit left after the excavation of the fill 2 with mortar rubble or rubble concrete in the U-shaped abutment 1;
[0018] (3) The grouted rubble or rubble concrete is flush with the top of the U-shaped abutment 1, therefore, there is no need to set up the abutment plate behind the abutment of the U-shaped abutment 1.
[0019] The excavation depth is at least the part of the filling soil above the conical slope protection surface of U-shaped abutment 1, and replace it with masonry rubble or low-strength rubble concrete to completely eliminate the lateral pressure of the soil in this range. After reinforcem...