Construction process for implementing post-cast strip casting by post-cast strip stiff steel pipe support system

A technology of steel pipe support and construction technology, which is applied in the processing of building materials, construction, building construction, etc., and can solve the problem of inability to use the unloading platform and the atrium opening to discharge and feed materials, affecting formwork removal, plastering, and secondary Structure, decoration and other construction progress issues, to achieve the effect of shortening the construction period, saving rental costs, and fast operation

Active Publication Date: 2013-04-24
扬州市江都区仙女基础设施建设有限公司
View PDF5 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, due to the limited arrangement of tower cranes and construction elevators on site, and the construction unit often adopts post-casting belt formwork support system without dismantling or retaining vertical poles during early formwork removal, for the case of large number and long length of post-casting belts Under the circumstances, when materials are turned over, each construction section cannot use the unloading platform and the atrium opening to discharge and feed materials, which greatly affects the construction progress of formwork removal, plastering, secondary structure, decoration, etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction process for implementing post-cast strip casting by post-cast strip stiff steel pipe support system
  • Construction process for implementing post-cast strip casting by post-cast strip stiff steel pipe support system
  • Construction process for implementing post-cast strip casting by post-cast strip stiff steel pipe support system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] 1. Preparation of cylindrical straight rigid steel pipe:

[0026] One end of each cylindrical straight rigid steel pipe is sealed to the steel plate.

[0027] 2. Construction steps:

[0028] 1. Open two rows of openings on the laid beam bottom formwork. Each row of openings is arranged on both sides of the post-casting belt and controlled in the same row of openings. The distance between adjacent openings shall not exceed 4m.

[0029] 2. Put a straight rigid steel pipe in each hole (such as figure 2 As shown), the sealed end of the steel plate faces upward, and the lower end of each straight rigid steel pipe is supported by a steel pad with a height of not more than 40mm (such as image 3 As shown), make the upper end face of each straight stiffened steel pipe flush with the upper plane of the beam bottom formwork, and adjust each straight stiffened steel pipe to be perpendicular to the ground.

[0030] 3. Use long steel pipes to pull them vertically and hor...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Heightaaaaaaaaaa
Login to view more

Abstract

The invention relates to a construction process for implementing post-cast strip casting by a post-cast strip stiff steel pipe support system and relates to the construction technique of post-cast strip casting for buildings. Arranging two rows of holes on spread beam-bottom form boards, and a straight stiff steel pipe is allowed to penetrate through each hole. A hoop steel pipe is disposed between the two rows of straight stiff steel pipes below the two rows of holes. Floor concrete is cast on the beam-bottom form boards. After the cast floor concrete solidifies, the hoop steel pipe is removed and concrete casting and maintenance are performed to post-cast strips. The beam-bottom form boards and the straight rigid steel pipes are removed finally. Cost of secondary form erecting materials is low, cost in renting the material is lowered greatly, and the total cost is about two times of that of the existing construction method. The straight stiff steel pipes are reusable. The construction segments are mutually communicated, so that effective and fast turnover of the materials is guaranteed, engineering cost is reduced greatly and construction period is shortened greatly.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a construction method for post-casting tape pouring of buildings. Background technique [0002] At present, the distance between the post-cast belts of large commercial buildings is generally about 40 meters. The number is greatly reduced, while reducing the number of post-casting belts, the construction area of ​​each section is greatly increased. When construction units carry out commercial building construction, they often carry out horizontal water flow and vertical flow water segmental construction according to the division of post-pouring belts and the location of expansion joints, and the design generally requires that the pouring time of post-pouring belts be more than 90 days after concrete pouring on both sides or After the main structure is capped, due to the large area of ​​the construction section, the turnover of materials is undoubtedly the key issue...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E04G21/02
Inventor 姜忠杨建民
Owner 扬州市江都区仙女基础设施建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products