A method and system for realizing business continuity during media plane update
An update process and media plane technology, applied in the transmission system, connection management, electrical components, etc., can solve problems such as business interruption, multiple data packets, data service interruption, etc., and achieve the effect of avoiding interruption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0062] figure 2 It is a schematic flow chart of Embodiment 1 of the method for implementing service continuity during the media plane update process of the present invention, as shown in figure 2 As shown, the method includes the following steps:
[0063] UE 1 on the originating side communicates with UE 2 on the terminating side. The media plane addresses and ports involved are: the receiving address of UE 1 on the initiating side is Address 11, the port is Port 11, and the receiving address of UE2 on the terminating side is Address 21, the port is Port21; at a certain moment, UE 1 decides to change the port on the media plane to Port12; where, since this embodiment only involves the interaction on the originating side, the following PGW, PCRF, P- Both CSCF and UE 1 are devices located at the calling side.
[0064] Step 201, the P-CSCF receives the IMS update message sent by UE 1, which carries the SDP offer, and is used for UE 1 on the calling side to request to change t...
Embodiment 2
[0079] image 3 It is a schematic flow diagram of Embodiment 2 of the method for implementing service continuity during the process of updating the media plane in the present invention, as shown in image 3 As shown, the method includes the following steps:
[0080] UE 1 on the originating side communicates with UE 2 on the terminating side, and the media plane addresses and ports involved: the receiving address of UE 1 on the initiating side is Address 11, the port is Port 11, and the receiving address of UE 2 on the terminating side It is Address 21, and the port is Port 21; at some point, UE 1 decides to change the port on the media plane to Port 12.
[0081] Steps 301 to 310 are the same as steps 201 to 210.
[0082] In step 311, the P-GW starts a preset timer.
[0083] Step 312, when the started timer expires, the P-GW deletes the port Port 11 of UE 1 in the flow description information of the PCC rule corresponding to the service information (that is, closes the port ...
Embodiment 3
[0085] Figure 4 It is a schematic flow diagram of Embodiment 3 of the method for realizing business continuity during the process of updating the media plane in the present invention, as shown in Figure 4 As shown, the method includes the following steps:
[0086] UE 1 on the originating side communicates with UE 2 on the terminating side, and the media plane addresses and ports involved: the receiving address of UE 1 on the initiating side is Address 11, the port is Port 11, and the receiving address of UE 2 on the terminating side It is Address 21, and the port is Port 21; at some point, UE 1 decides to change the port on the media plane to Port 12.
[0087] Steps 401 to 407 are the same as steps 201 to 207.
[0088] Step 408, PCRF updates the local PCC rule according to the new flow description information in the received service information, that is, in the flow description information of the PCC rule corresponding to the service data flow of the service information, t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


