Offshore wind turbine generator set installation fundamental assembly
A technology for installing foundations and offshore wind power, applied in infrastructure engineering, construction, etc., can solve problems such as high construction cost, shortened construction period, and difficult construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0012] Such as figure 1 As shown, Embodiment 1 of the present invention provides an installation foundation assembly for offshore wind turbines. The installation foundation assembly includes a main pile 1 and at least one auxiliary pile 2 arranged around the main pile 1. Both the main pile 1 and the auxiliary pile 2 It is made of reinforced concrete. One end of the main pile 1 is placed in the seabed for fixing on the seabed, and the other end extends out of the sea level. The auxiliary pile 2 is set parallel to the main pile 1, and one end is placed in the seabed for fixing on the seabed. , the other end is placed below the sea level, so the auxiliary pile 2 is shorter than the main pile 1, and the auxiliary pile 2 can also be higher than the main pile 1 or equal to the main pile 1, which does not affect the use effect here. Pile 2 can meet the requirements, and can achieve the effect of use and save materials. The top of the main pile 1 is fixedly connected with a transition...
Embodiment 2
[0016] Such as image 3 Shown, on the basis of above-mentioned embodiment, auxiliary pile 2 is more than two (in this embodiment, be two, also can be many, can be adjusted according to geological situation and stressed situation, conduit and auxiliary pile are according to steel pipe inclination The number of braces is adjusted accordingly) and is arranged around the main pile 1, and a horizontal support rod is fixedly connected between the conduits 5 on the two adjacent auxiliary piles 2, preferably a horizontal support rod 7, which is used to enhance the level of the auxiliary pile 2. stiffness, thereby further enhancing the horizontal stiffness of the main pile 1. The horizontal support rods 7 are all made of metal material. Metal assembly weldments preset in the processing workshop such as Figure 4 As shown, the conduits 5 are respectively welded at one end of the two oblique support rods 6, the other ends of the two oblique support rods 6 are respectively welded on the...