A technology of modified asphalt and infusion bags, applied in building components, building insulation materials, buildings, etc., can solve problems such as harming human health, violating the sustainable development of solid waste, waste of "urban mineral" resources, etc. performance, cost reduction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0032] 1. Formula according to the mass ratio:
[0033] Base bitumen 100 kg
[0034] Infusion bag film 4.5 kg
[0035] Nano montmorillonite 2 kg
[0036] POE-g-MAH1.5kg
[0037] 2. Preparation
[0038] Heat and melt the base asphalt, keep the temperature at 170°C, add the compatibilizer POE-g-MAH, and mechanically shear at a speed of 500rpm / min for 5min; then add discarded disposable multi-layer co-extruded infusion bag film fragments, 10 minutes of mechanical shearing at a rotating speed of 1 min; then adding nano-montmorillonite, and sending the mixture into a high-speed shearing machine, and mechanically shearing for 90 minutes at a rotating speed of 2000 rpm / min; Obtain the modified asphalt described in the present invention and prepare the modified asphalt described in the present invention.
[0039] Test the penetration according to GB / T0604-2000, test the softening point according to GB / T0606-2000, test the ductility according to GB / T0605-1993, and use the AR-2000 ...
example 2
[0042] 1. Formula according to the mass ratio:
[0043] Base bitumen 100 kg
[0044] Infusion bag film 7kg
[0045] Nano montmorillonite 2 kg
[0046] PP-g-(GMA-co-St) 2kg
[0047] 2. Preparation
[0048] Take base asphalt and heat and melt, keep the temperature at 210°C, add compatibilizer POE-g-MAH, and manually stir for 15 minutes; then add discarded disposable multi-layer co-extruded infusion bag film fragments, and manually stir for 10 minutes; then add nano-montmorillonite soil, the mixture was sent to a high-speed shearing machine, and mechanically sheared at a speed of 6000 rpm / min for 30 minutes; finally, the temperature was lowered to 100°C and left for 60 minutes to obtain the modified asphalt of the present invention.
[0049] Test the penetration according to GB / T0604-2000, test the softening point according to GB / T0606-2000, test the ductility according to GB / T0605-1993, use the AR-2000 rotational rheometer to test the complex viscosity at 65°C, this example ...
example 3
[0052] 1. Formula according to the mass ratio:
[0053] Base bitumen 100 kg
[0054] Infusion bag film 9 kg
[0055] Nano montmorillonite 2 kg
[0056] POE-g-MAH1.5 kg
[0057] 2. Preparation
[0058] Heat and melt the base asphalt, keep the temperature at 190°C, add compatibilizer POE-g-MAH, and mechanically shear at a speed of 400rpm / min for 25min; 25 minutes of mechanical shearing at a rotational speed of 1 min; then adding nano-montmorillonite, and sending the mixture into a high-speed shearing machine, and mechanically shearing and processing 70 min at a rotational speed of 4000 rpm / min; Obtain the modified asphalt of the present invention.
[0059] Test the penetration according to GB / T0604-2000, test the softening point according to GB / T0606-2000, test the ductility according to GB / T0605-1993, use the AR-2000 rotational rheometer to test the complex viscosity at 65°C, this example The specific data of the prepared modified asphalt are as follows:
[0060] ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| softening point | aaaaa | aaaaa |
| penetration | aaaaa | aaaaa |