A production method of easy-to-form high-strength medium-thick steel plate
A production method and technology of thick steel plates, applied in heat treatment equipment, heat treatment process control, manufacturing tools, etc., can solve problems such as difficulty in meeting actual use requirements, low uniform elongation of steel plates, uncontrolled yield ratio, etc., and achieve physical cold bending Performance satisfaction, improved welding performance, and reduced yield ratio
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Embodiment 1: 20mmQ890E steel plate production method
[0027] The chemical composition of the steel is shown in Table 3.
[0028] Table 3 Composition performance of 20mm Q890E steel plate %
[0029] chemical composition C Si mn P S Nb+V+Ti Cr + Mo Alt Pcm CEV Performance 0.08 0.20 1.69 0.013 0.001 0.105 0.91 0.032 0.25 0.58
[0030] Main process steps:
[0031] a. Sulfur content of molten iron S≤0.020%, temperature ≥1250°C, the slag must be cleaned before the molten iron enters the converter. Converter end point control target: C-T coordinated tapping, P 0.013%, S 0.019%; strict slag blocking and tapping, slag thickness ≤ 50mm, tapping time 6min, 1 / 5 of tapping is added with alloy, 2 / 5 of tapping is finished with alloy ; After the steel is tapped into the Al wire 260m deoxidation.
[0032] b. The electrification time of the molten steel in the LF furnace is 22 minutes, the total argon blowing time is 42 minutes, and the...
Embodiment 2
[0038] Embodiment 2: 30mm Q890E steel plate production method
[0039] The chemical composition of the steel is shown in Table 4.
[0040] Table 4 Composition performance of 30mm Q890E steel plate %
[0041] chemical composition C Si mn P S Nb+V+Ti Cr + Mo Alt Pcm CEV Performance 0.08 0.23 1.67 0.013 0.003 0.110 0.93 0.034 0.26 0.59
[0042] a. Sulfur content of molten iron S≤0.020%, temperature ≥1250°C, the slag must be cleaned before the molten iron enters the converter. Converter end point control target: C-T coordinated tapping, P 0.012%, S 0.016%; strict slag blocking, slag thickness ≤ 50mm, tapping time 6min, 1 / 5 of tapping is added with alloy, 2 / 5 of tapping is finished with alloy ; After the steel is tapped into the Al wire 300m deoxidation.
[0043] b. The electrification time of the molten steel in the LF furnace is 27 minutes, the total argon blowing time is 44 minutes, and the white slag retention time is 15 minutes....
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |