[0026] Embodiment 1: 20mm Q800E steel plate production method
[0027] The chemical composition of the steel is shown in Table 3.
[0028] Table 3 Composition performance of 20mm Q800E steel plate (%)
[0029] chemical composition C Si mn P S Nb+V+Ti Cr + Mo Alt Pcm CEV Performance 0.08 0.22 1.69 0.013 0.003 0.065 0.46 0.034 0.22 0.53
[0030] Main process steps:
[0031] a. Sulfur content of molten iron S≤0.020%, temperature ≥1250°C, the slag must be cleaned before the molten iron enters the converter. Converter end point control target: C-T coordinated tapping, P 0.014%, S 0.018%; strict slag blocking and tapping, slag thickness ≤ 50mm, tapping time 7min, 1 / 5 of tapping is added with alloy, 2 / 5 of tapping is finished with alloy ; After the steel is tapped into the Al line 290m deoxidation.
[0032] b. The electrification time of the molten steel in the LF furnace is 24 minutes, the total argon blowing time is 41 minutes, and ...
Embodiment 2
[0038] Embodiment 2: 30mm Q800E steel plate production method
[0039] The chemical composition of the steel is shown in Table 4.
[0040] Table 4 Composition performance of 30mm Q800E steel plate (%)
[0041] chemical composition C Si mn P S Nb+V+Ti Cr + Mo Alt Pcm CEV Performance 0.08 0.23 1.67 0.013 0.003 0.110 0.93 0.034 0.26 0.59
[0042] Main process steps:
[0043] a. Sulfur content of molten iron S≤0.020%, temperature ≥1250°C, the slag must be cleaned before the molten iron enters the converter. Converter end point control target: C-T coordinated tapping, P 0.013%, S 0.016%; strict slag blocking, slag thickness ≤ 50mm, tapping time 6min, 1 / 5 of tapping is added with alloy, 2 / 5 of tapping is finished with alloy ; After the steel is tapped into the Al wire 300m deoxidation.
[0044] b. The electrification time of the molten steel in the LF furnace is 22 minutes, the total argon blowing time is 44 minutes, and the white sl...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 