A production method and technology for thick steel plates, applied in the field of steelmaking, can solve problems such as difficulty in meeting actual use requirements, uncontrolled yield-to-strength ratio, and low uniform extension of steel plates, so as to improve the ability to resist dynamic loads and reduce yield-strength ratio. , The effect of improving welding performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Example 1: The composition of the 20mm Q550D steel plate is shown in Table 3.
[0027] Table 3 Composition performance of 20mm Q550D steel plate (%)
[0028]
[0029] The main process steps are as follows:
[0030] a. The sulfur content of molten iron is S≤0.020%, the temperature is ≥1250°C, and the slag is cleaned before the molten iron enters the converter. Converter end point control target: C-T coordinated tapping, P = 0.014%, S = 0.018%; Strictly block slag tapping, slag thickness ≤ 50mm, tapping time 7min, 1 / 5 of tapping is added with alloy, 2 / 5 of tapping is added Finish the alloy; after tapping, inject Al wire 280m for deoxidation.
[0031] b. The electrification time of the molten steel in the LF furnace is 25 minutes, the total argon blowing time is 46 minutes, and the white slag retention time is 18 minutes. Feed Al line and adjust Alt, Als=0.040% at the end of the treatment of molten steel in the argon station, and set oxygen at 4ppm when the molten st...
Embodiment 2
[0038] The composition of 40mm Q550D steel plate is shown in Table 4.
[0039] Table 4 Composition performance of 40mm Q550D steel plate (%)
[0040]
[0041] The main process steps are as follows:
[0042] a. Sulfur content of molten iron S≤0.020%, temperature ≥1250°C, the slag must be cleaned before the molten iron enters the converter. Converter end point control target: C-T coordinated tapping, P 0.013%, S 0.015%; strict slag blocking, slag thickness ≤ 50mm, tapping time 6min, 1 / 5 of tapping is added with alloy, 2 / 5 of tapping is finished with alloy ; After the steel is tapped into the Al line 290m deoxidation.
[0043] b. The electrification time of the molten steel in the LF furnace is 27 minutes, the total argon blowing time is 40 minutes, and the white slag retention time is 16 minutes. Feed the Al line and adjust Alt, the argon station processes the molten steel to finish Als0.042%, and the molten steel leaves the station to fix the oxygen at 4ppm. Feed the Fe-...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 