Production method of easily-shaped high-strength medium-thickness steel plate
A production method and thick steel plate technology, applied in the field of steelmaking, can solve problems such as difficult to meet the actual use requirements, uncontrolled yield strength ratio, poor cold-formation performance, etc., to improve the ability to resist dynamic loads and reduce yield strength Compared with the effect of improving welding performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Embodiment 1: 20mmQ890D steel plate production method
[0027] The chemical composition of the steel is shown in Table 3.
[0028] Table 3 Composition performance of 20mmQ890D steel plate (%)
[0029] chemical composition C Si mn P S Nb+V+Ti Cr + Mo Alt Pcm CEV Performance 0.08 0.20 1.65 0.012 0.003 0.106 0.94 0.032 0.25 0.59
[0030] Main process steps:
[0031] a. Sulfur content of molten iron S≤0.020%, temperature ≥1250°C, the slag must be cleaned before the molten iron enters the converter. Converter end point control target: C-T coordinated tapping, P 0.011%, S 0.019%; strict slag blocking and tapping, slag thickness ≤ 50mm, tapping time 7min, 1 / 5 of tapping is added with alloy, 2 / 5 of tapping is finished with alloy ; After the steel is tapped into the Al line 290m deoxidation.
[0032] b. The electrification time of the molten steel in the LF furnace is 23 minutes, the total argon blowing time is 44 minutes, and th...
Embodiment 2
[0038] Embodiment 2: 30mmQ890D steel plate production method
[0039] The chemical composition of the steel is shown in Table 4.
[0040] Table 4 Composition performance of 30mmQ890D steel plate (%)
[0041] chemical composition C Si mn P S Nb+V+Ti Cr + Mo Alt Pcm CEV Performance 0.08 0.23 1.66 0.013 0.001 0.114 0.94 0.036 0.26 0.59
[0042] Main process steps:
[0043] a. Sulfur content of molten iron S≤0.020%, temperature ≥1250°C, the slag must be cleaned before the molten iron enters the converter. Converter end point control target: C-T coordinated tapping, P 0.014%, S 0.018%; strict slag blocking and tapping, slag thickness ≤ 50mm, tapping time 6min, 1 / 5 of tapping is added with alloy, 2 / 5 of tapping is finished with alloy ; After the steel is tapped into the Al wire 300m deoxidation.
[0044] b. The electrification time of the molten steel in the LF furnace is 26 minutes, the total argon blowing time is 44 minutes, and th...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 