A production method and thick steel plate technology, applied in the field of steelmaking, can solve problems such as difficulty in meeting actual use requirements, poor cold-formation performance, and uncontrolled yield strength ratio, so as to improve the ability to resist dynamic loads and reduce yield strength Ratio, the effect of reducing the yield strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Embodiment 1: The production method of 30mm Q620F steel plate
[0027] The chemical composition of the steel is shown in Table 3.
[0028] Table 3 Composition performance of 30mm Q620F steel plate (%)
[0029] chemical composition C Si mn P S Nb+V+Ti Cr + Mo Alt Pcm CEV Performance 0.08 0.22 1.45 0.012 0.003 0.047 0.32 0.029 0.20 0.47
[0030] Main process steps:
[0031] a. Sulfur content of molten iron S≤0.020%, temperature ≥1250°C, the slag must be cleaned before the molten iron enters the converter. Converter end point control target: C-T coordinated tapping, P= 0.013%, S= 0.015%; Strictly block slag tapping, slag thickness ≤ 50mm, tapping time 6min, 1 / 5 of tapping is added with alloy, 2 / 5 of tapping is plus Finish the alloy; after tapping, inject Al wire 290m for deoxidation.
[0032] b. The electrification time of the molten steel in the LF furnace is 27 minutes, the total argon blowing time is 43 minutes, and the ...
Embodiment 2
[0038] Embodiment 2: the production method of 20mm Q620F steel plate
[0039] The chemical composition of the steel is shown in Table 4.
[0040] Table 4 Composition performance of 20mm Q620F steel plate (%)
[0041] chemical composition C Si mn P S Nb+V+Ti Cr + Mo Alt Pcm CEV Performance 0.08 0.20 1.57 0.013 0.001 0.068 0.42 0.035 0.20 0.49
[0042] Main process steps:
[0043] a. Sulfur content of molten iron S≤0.020%, temperature ≥1250°C, the slag must be cleaned before the molten iron enters the converter. Converter end point control target: C-T coordinated tapping, P 0.014%, S 0.018%; strict slag blocking, slag thickness ≤ 50mm, tapping time 7min, 1 / 5 of tapping is added with alloy, 2 / 5 of tapping is finished with alloy ; After the steel is tapped into the Al wire 280m deoxidation.
[0044] b. The electrification time of the molten steel in the LF furnace is 23 minutes, the total argon blowing time is 43 minutes, and the w...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 