A production method of easy-to-form high-strength medium-thick steel plate
A production method and technology for thick steel plates, applied in the field of steelmaking, can solve problems such as difficulty in meeting actual use requirements, uncontrolled yield-to-strength ratio, low uniform extension of steel plates, etc. , The effect of improving welding performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] 20mm steel plate Q550E steel, the chemical composition of the steel is shown in Table 3.
[0028] Table 3 Composition performance of 20mm steel plate Q550E steel plate (%)
[0029] chemical composition C Si mn P S Nb+V+Ti Cr + Mo Alt Pcm Performance 0.07 0.32 1.51 0.011 0.001 0.045 0.25 0.032 0.19
[0030] The main process steps and parameters are as follows:
[0031] a. Sulfur content of molten iron S≤0.020%, temperature ≥1250°C, the slag must be cleaned before the molten iron enters the converter. Converter end point control target: C-T coordinated tapping, P 0.014%, S 0.017%; strict slag blocking and tapping, slag thickness ≤ 50mm, tapping time 7min, 1 / 5 of tapping is added with alloy, 2 / 5 of tapping is finished with alloy ; After the steel is tapped into the Al wire 300m deoxidation.
[0032] b. The electrification time of the molten steel in the LF furnace is 25 minutes, the total argon blowing time is 45 minutes, and t...
Embodiment 2
[0039] 40mm steel plate Q550E steel, the chemical composition of the steel is shown in Table 4.
[0040] Table 4 Composition performance of 40mm Q550E steel plate (%)
[0041] chemical composition C Si mn P S Nb+V+Ti Cr + Mo Alt Pcm Performance 0.08 0.32 1.50 0.012 0.003 0.046 0.25 0.038 0.20
[0042] The main process steps and parameters are as follows:
[0043] a. Sulfur content of molten iron S≤0.020%, temperature ≥1250°C, the slag must be cleaned before the molten iron enters the converter. Converter end point control target: C-T coordinated tapping, P 0.013%, S 0.015%; strict slag blocking, slag thickness ≤ 50mm, tapping time 6min, 1 / 5 of tapping is added with alloy, 2 / 5 of tapping is finished with alloy ; After the steel is tapped into the Al line 290m deoxidation.
[0044] b. The electrification time of the molten steel in the LF furnace is 27 minutes, the total argon blowing time is 43 minutes, and the white slag retention ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |