Roof greening, water-discharging and water-storing porous brick and manufacturing process thereof
A technology of roof greening and manufacturing technology, which is applied in the field of building materials, can solve problems such as insufficient soil depth, poor drainage, and low plant survival rate, and achieve the effect of protecting green resources and reducing waste
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0013] A roof green drainage water storage porous brick, its components include 2 tons / m3 of clay and 1.5 kg / m3 of polyurethane foam balls, the production process includes the following steps:
[0014] (1) Clay and polyurethane foam balls are screened, and after screening, enter the fine crushing roller machine for crushing and mixing;
[0015] (2) Enter the box type feeder and the internal combustion feeder respectively to feed to the twin-shaft mixer for stirring;
[0016] (3) After stirring, enter the double-click vacuum brick making machine in turn for brick making, strip cutting machine cutting, and embryo cutting machine cutting;
[0017] (4) The semi-finished product after cutting enters the wheel kiln for firing, the firing time is 20 hours, and the firing temperature is 980°C, and the finished product is obtained after firing.
[0018] Wherein the waste blanks cut by the embryo cutting machine in step (3) can also be recycled to the twin-shaft mixer for stirring and ...
Embodiment 2
[0020] A roof greening drainage water storage porous brick, its components include 2.2 tons / m3 of clay and 2 kg / m3 of polyurethane foam balls, the production process includes the following steps:
[0021] (1) Clay and polyurethane foam balls are screened, and after screening, enter the fine crushing roller machine for crushing and mixing;
[0022] (2) Enter the box type feeder and the internal combustion feeder respectively to feed to the twin-shaft mixer for stirring;
[0023] (3) After stirring, enter the double-click vacuum brick making machine in turn for brick making, strip cutting machine cutting, and embryo cutting machine cutting;
[0024] (4) The semi-finished product after cutting enters the wheel kiln for firing. The firing time is 21 hours, and the firing temperature is 1040°C. After firing, the finished product is obtained.
Embodiment 3
[0026] A roof greening drainage water storage porous brick, its components include 2.5 tons / m3 of clay and 2.5 kg / m3 of polyurethane foam balls, the production process includes the following steps:
[0027] (1) Clay and polyurethane foam balls are screened, and after screening, enter the fine crushing roller machine for crushing and mixing;
[0028] (2) Enter the box type feeder and the internal combustion feeder respectively to feed to the twin-shaft mixer for stirring;
[0029] (3) After stirring, enter the double-click vacuum brick making machine in turn for brick making, strip cutting machine cutting, and embryo cutting machine cutting;
[0030] (4) The semi-finished product after cutting enters the wheel kiln for firing. The firing time is 22 hours and the firing temperature is 1100°C. After firing, the finished product is obtained.