Fracturing working method of multi-stage hydraulic jet staged fracturing string
A hydrojet and staged fracturing technology, which is applied in the direction of drill pipe, casing, earthwork drilling and production, etc., can solve the problem of increasing the construction operation cycle and operation cost, not mentioning the optional setting packer, and economic benefits In order to achieve the effect of simple fracturing work method, reduce backsplash damage, and reduce string creep
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0089] The invention discloses a fracturing method for multi-stage hydraulic jet staged fracturing pipe string, and the steps are as follows:
[0090] S1: The multi-stage hydraulic jet staged fracturing string shall be cleared and washed before going down;
[0091] S2: Assemble multi-stage hydraulic jet staged fracturing string;
[0092] S3: Drill down and adjust the drilling tool to the construction position;
[0093] S4: Install wellhead and surface pipelines, and test pressure;
[0094] S5: Construct the first stage in accordance with the pump injection procedure designed for fracturing construction. After the construction is completed, the oil pipe will be blown out, and after the spray pressure is weakened, 600L / min reverse circulation is used to assist drainage;
[0095] S6: Adjust the position of the drilling tool so that the ejector is facing the designed spray point of the second section, and then construct the second section according to the pump injection procedure. After comp...
Embodiment 2
[0100] On the basis of Example 1, when the multi-stage hydraulic jet segmented fracturing string is opened and the spray gun sandblasting and perforating in steps S5, S6, S7 and S8 are implemented, the oil pressure is abnormally high. You should check the comparison first Physical properties of the interval and oil pressure during sandblasting and perforation,
[0101] (1) If the physical properties of the intervals are similar, and the injection pressure of each interval is abnormally high, and the casing fluid is normal, it is determined that the reason is the formation rather than the tool. The treatment method at this time: Continue construction under circumstances;
[0102] (2) If the physical properties of the intervals are similar, but the injection oil pressure between the intervals is large and the difference is abnormally high, it is judged that the nozzle is blocked by foreign matter or sand. The treatment method at this time: check and adjust the liquid glue ratio in ti...
Embodiment 3
[0105] On the basis of Example 2, when the spray gun is opened for blasting and perforating, the oil pressure is abnormally low. First compare with the injection pressure of the previous stage. If the injection pressure is significantly reduced, it is judged that the nozzle erosion is serious. method:
[0106] (1) According to the operating instructions, turn on the next "spray unit" of the tool string or drill out to check and replace the tool;
[0107] (2) The multi-stage hydraulic jet staged fracturing pipe string has damaged points, and the drill is checked.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com