Method for preventing high and large formwork full hall fastener type tubular steel scaffolding from lateral displacement
A technology of tall formwork and scaffolding, which is applied to the attachments of scaffolding, housing structure support, housing structure support and other directions, can solve the problems of small step distance of horizontal rod, low bearing capacity, low utilization rate of steel pipe strength, etc., and can increase the step distance. , Improve the effect of overall stable bearing capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0013] The present invention will be further described below. The following examples are only used to illustrate the technical solution of the present invention more clearly, but not to limit the protection scope of the present invention.
[0014] The method of the present invention is based on the standard construction requirements and construction methods of the traditional tall formwork full of fastener-type steel pipe scaffolding, and adds an anti-side-shift structure to the tall formwork exceeding the general 3-meter-high building. The specific implementation method is: in the tall formwork In the horizontal and vertical directions of the central part of the steel pipe scaffolding with fasteners, a row of cable wind rope bracing is provided every 15 meters, and a cable wind rope diagonal bracing is installed at each step along the height of the full hall scaffold. There are two symmetrical left and right bracings for each cable wind rope. The upper end is fixed with the i...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More