Lengthened working device of loading machine
A working device and loader technology, applied in the direction of mechanically driven excavators/dredgers, etc., can solve problems such as inability to unload the goods, insufficient flat extension, and inability to meet the requirements of some special industries and special places. The effect of high work efficiency and short cycle time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0013] Such as figure 1 As shown, a loader lengthened working device includes a boom 1, a boom cylinder 2, a bucket cylinder 3, a rocker 4, a pull rod 5 and a bucket 6, and a vehicle frame 7 is connected to the boom 1, the boom and the bucket 6 respectively. The arm cylinder 2 and bucket cylinder 3 are hinged at points A, S, and G, the boom 1 and bucket 6 are hinged at point B, and the other end of the boom cylinder 2 is hinged at point Q with the boom 1 , the other end of the bucket oil cylinder 3 is hinged with the rocker arm 4 at point F, the rocker arm 4 is hinged with the boom 1 at point E, and the tie rod 5 is hinged with the rocker arm 4 and bucket 6 at D, At point C, the boom cylinder 2 can be stretched to make the boom 1 rotate around point A, and the bucket cylinder 3 can be stretched, by pushing the rocker arm 4 to rotate around point E and then driving the pull rod 5 to make the bucket 6 around When point B rotates, the projected distance between the hinge points ...
Embodiment 2
[0015] Such as figure 2 As shown, a loader lengthened working device includes a boom 1, a boom cylinder 2, a bucket cylinder 3, a rocker 4, a pull rod 5 and a bucket 6, and a vehicle frame 7 is connected to the boom 1, the boom and the bucket 6 respectively. The arm cylinder 2 and bucket cylinder 3 are hinged at points A, S, and G, the boom 1 and bucket 6 are hinged at point B, and the other end of the boom cylinder 2 is hinged at point Q with the boom 1 , the other end of the bucket oil cylinder 3 is hinged with the rocker arm 4 at point F, the rocker arm 4 is hinged with the boom 1 at point E, and the tie rod 5 is hinged with the rocker arm 4 and bucket 6 at D, At point C, the boom cylinder 2 can be stretched to make the boom 1 rotate around point A, and the bucket cylinder 3 can be stretched, by pushing the rocker arm 4 to rotate around point E and then driving the pull rod 5 to make the bucket 6 around When point B rotates, the projected distance between the hinge points...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 