A technology of soft foundation treatment and experimental device, applied in material inspection products, soil material testing, etc., can solve problems such as difficulty in reaching, affecting development speed, and long time for treatment of foundations, so as to improve treatment efficiency, shorten treatment time, and improve treatment efficiency. significant effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] This embodiment proposes a soft ground treatment experimental device, such as figure 1 , which includes an experimental box, a vacuum drainage system, and a vacuum grouting system. The experimental box has an accommodating cavity 12 for placing the test soil; the vacuum drainage system is mainly composed of a plurality of vertical drainage boards 6, a first horizontal drainage pipe 7, a drainage pipe and a vacuum pump 1, and a plurality of vertical drainage boards 6 and the first horizontal drain pipe 7 are located in the housing chamber 12, the tops of a plurality of vertical drain plates 6 are respectively connected with the first horizontal drain pipe 7, and the drain pipe passes through the experimental box to be connected with the first horizontal drain pipe 7, and the drain pipe The outlet of the vacuum grouting system is mainly composed of a grouting pipe 9, a grouting pipe and a grouting pump 17, the grouting pipe 9 is located in the housing chamber 12, and the ...
Embodiment 2
[0036] The present embodiment proposes a soft ground treatment experimental method, which specifically includes the following steps:
[0037] ①According to the internal dimensions of the accommodation chamber in the soft ground treatment experimental device, the experimental content in the soft ground treatment experimental device and the model similarity theory, determine the depth of the vertical drainage plate inserted into the test soil in the soft ground treatment experimental device, The width of the vertical drainage board and the spacing between two adjacent vertical drainage boards inserted into the test soil. In this embodiment, the height of the vertical drainage boards ranges from 1000mm to 1400mm, the width of the vertical drainage boards ranges from 40mm to 100mm, and the distance between two adjacent vertical drainage boards ranges from 300mm to 400mm.
[0038] If the experimental results carried out in this experimental device are extended to the actual project...