Power control method and device for data system
A power control and data system technology, applied in the field of data processing, can solve the problems of limited functions and low precision of data systems
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0121] figure 1 It is a flow chart of the power control method of the data system provided by Embodiment 1 of the present invention. The method in this embodiment is suitable for power control in a data system. The data system includes at least one data node. When multiple data nodes are included, each data node can control power independently, or multiple data nodes can form a data cluster, which is unified by the data cluster. Perform power control. A data cluster includes multiple data nodes. The data nodes can be different data center devices, and the applications running on different data nodes may be different in terms of quantity and function. Data clusters, that is, clusters of data system center equipment, can be divided into different clusters of data system center equipment according to different rules, such as equipment size, heat dissipation, or connection relationship with other equipment. The data system includes a complete set of complex facilities, including...
Embodiment 2
[0140] figure 2 It is a flow chart of the power control method of the data system provided by Embodiment 2 of the present invention. The power control method of the data system provided by Embodiment 2 of the present invention is further optimized on the basis of Embodiment 1, and is specifically applicable to power control when application programs to be started on a single data node apply for resources. In this embodiment, the above step 100 specifically includes:
[0141] Step 200, receiving a resource application initiated by the application program to be started to the data node.
[0142] The to-be-started application program may be a newly installed to-be-started application program, and before running, it needs to apply for resources, including software resources and hardware resources. The application program to be started may also be an existing application program, and since the frequency of use is low, resource application needs to be re-applied before each opera...
Embodiment 3
[0189] Figure 4 The flow chart of the power control method of the data system provided by the third embodiment of the present invention, this embodiment is optimized on the basis of the first embodiment, and provides a solution for a single data node to perform power control based on the resources of the running application program, Above-mentioned step 100 specifically comprises:
[0190] Step 400, monitor in real time the resources occupied by the running application in the data node, and determine the measured power of the application based on a set function as the power consumption.
[0191] Specifically, the data system will monitor the power consumption status of each application program in a data node in real time, and the monitoring of the power consumption status of the application program is mainly obtained by monitoring the resources occupied by the application program and determining it according to a set function.
[0192] The measured power of the application p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com