Pneumatic cutting method of automobile acoustic part ceiling
A technology for acoustic parts and pneumatic cutting, applied in chemical instruments and methods, lamination devices, lamination auxiliary operations, etc., to achieve the effects of energy saving, lightweight mechanism, and cost reduction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0021] Example 1 Product name: SGMG61 canopy
[0022] The pneumatic cutting method of the canopy of automobile acoustic parts, the steps are as follows:
[0023] (1) Laying of substrate and fabric: Lay the substrate from bottom to top in the order of non-woven fabric, glass fiber fabric and polyurethane PU fabric or polypropylene PP fabric; cover the surface of the substrate with a layer of knitted fabric or non-woven fabric , to obtain the semi-finished product to be formed;
[0024] (2) Forming: take the semi-finished product to be formed obtained in step (1) and put it into a mold with a mold gap of 4.5 mm; the forming temperature is 330 °C, the pressure is 5 MPa, and the forming time is 32 s to obtain the semi-finished product;
[0025] (3) Cutting of semi-finished products:
[0026] a. Put the semi-finished product obtained in step (2) on the pneumatic cutting tool, first position the semi-finished product front datum A, then position the intermediate ceiling light hole...
Embodiment 2
[0035] The pneumatic cutting method of the canopy of automobile acoustic parts, the steps are as follows:
[0036] (1) Laying of substrate and fabric: Lay the substrate from bottom to top in the order of non-woven fabric, glass fiber fabric and polyurethane PU fabric or polypropylene PP fabric; cover the surface of the substrate with a layer of knitted fabric or non-woven fabric , to obtain the semi-finished product to be formed;
[0037] (2) Forming: take the semi-finished product to be formed obtained in step (1) and put it into a mold with a mold gap of 4.3 mm; the forming temperature is 290°C, the pressure is 4 MPa, and the forming time is 35 s to obtain the semi-finished product;
[0038] (3) Cutting of semi-finished products:
[0039] a. Put the semi-finished product obtained in step (2) on the pneumatic cutting tool, first position the semi-finished product front datum A, then position the intermediate ceiling light hole datum B, and finally position the rear edge datu...
Embodiment 3
[0049] The pneumatic cutting method of the canopy of automobile acoustic parts, the steps are as follows:
[0050] (1) Laying of substrate and fabric: Lay the substrate from bottom to top in the order of non-woven fabric, glass fiber fabric and polyurethane PU fabric or polypropylene PP fabric; cover the surface of the substrate with a layer of knitted fabric or non-woven fabric , to obtain the semi-finished product to be formed;
[0051] (2) Forming: take the semi-finished product to be formed obtained in step (1) and put it into a mold, with a mold gap of 4.7 mm; the forming temperature is 350 ° C, the pressure is 4 MPa, and the forming time is 30 s, that is, the semi-finished product is obtained;
[0052] (3) Cutting of semi-finished products:
[0053] a. Put the semi-finished product obtained in step (2) on the pneumatic cutting tool, first position the semi-finished product front datum A, then position the intermediate ceiling light hole datum B, and finally position the r...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More