Trenchless gap dragging construction method
A construction method and non-excavation technology, which is used in pipeline laying and maintenance, pipe/pipe joint/pipe fittings, mechanical equipment, etc., can solve the complex preparation process of grouting liquid, complicated construction process of grouting liquid, and poor sealing performance of pipe body ends. and other problems, to achieve the effect of good sealing, not easy to solidify, and reduce tension
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
[0019] The grouting fluid formula for non-excavation gap dragging construction includes the following components in parts by weight: 20-22 parts of dry mud, 10-12 parts of plant slurry with high lubricity, and 68-70 parts of water , the lubricity of the grouting liquid is greatly improved due to the addition of high-lubricity plant slurry. The plant slurry is formed by crushing any one or more of plants including green onions, fungus, okra, yam, cactus and taro into a paste. As a preferred version, the plant slurry here adopts the pulverized scallion paste of scallions. The dry mud is sifted mud powder and the size of the sieve mesh is not more than 10mm, and the large particles in the dry mud are removed, so that the grouting fluid has a higher lubricity.
[0020] The grouting liquid is prepared according to the formula of the grou...