Unlock instant, AI-driven research and patent intelligence for your innovation.

Horizontal well switchable cementing and staged fracturing oil recovery technology

A technology for staged fracturing and horizontal wells, which is applied in the fields of production fluids, wellbore/well components, and earth-moving drilling. Effect

Active Publication Date: 2017-10-24
FUXIN CITY GASOLINEEUM TOOL FACTORY
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This technology has a long period from drilling to production and construction. It is difficult for the fracturing tool to be removed after fracturing, and it is easy to get stuck in the well, causing overhaul accidents. The construction of the later search and water plugging tools is cumbersome, and it is prone to well stuck accidents, resulting in overhaul accidents.
The second is to use the open hole packer and the sliding sleeve to hang on the technical casing with a hanger. After the hanger is thrown away, the drill pipe is lifted out and then connected back to the cannula and the hanger to connect and seal. The sliding sleeve configured by the open hole packer The inner hole of the sleeve shrinks in diameter step by step from the top to the bottom, which limits the number of fracturing stages. In the later stage, if the open hole packer fails and causes layer channeling, it cannot be treated. Once the water is seriously released, the well will be scrapped
The third is to use solid-injected sliding sleeve fracturing valve to complete the well. The sliding sleeve is connected with the casing and run into the well. After it is in place, the well is cemented. There are two ways of fracturing. One is to use the ball or rubber plug to open the sliding sleeve for fracturing. For valve fracturing, since the sliding sleeve is gradually reduced in diameter from top to bottom, the number of fracturing stages is limited, and the cementing quality of the horizontal section cannot be tested after the completion of cementing. Coiled tubing with a packer is dragged from bottom to top for fracturing. The fracturing construction has strict requirements on equipment and low construction efficiency, so it is not suitable for large-scale use

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Horizontal well switchable cementing and staged fracturing oil recovery technology
  • Horizontal well switchable cementing and staged fracturing oil recovery technology
  • Horizontal well switchable cementing and staged fracturing oil recovery technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0014] Examples, see attached figure 1 In the first step, the completion string is used to connect the string from bottom to top. The sequence of connection is float shoe 1, casing, constant pressure sliding sleeve 2, casing, cementing sliding sleeve, segmented fracturing valve 1, 3, casing , Cementing staged fracturing valve two 4, casing, cementing sliding sleeve staged fracturing valve three, four, five...n5, from the casing to the wellhead, the entire pipe string is full diameter. Reference attached figure 2 The second step is to send the fracturing ball seat by connecting the ball seat 7, the ball seat two 8, the ball seat three, four, five...n9, the positioner 11, the front end of the positioner 11 has a missing Hand 10, locator 11 to the wellhead, send ball seat 7 into the sliding sleeve segmented fracturing valve 3, pass the fracturing positioning device and positioning in the cementing sliding sleeve segmented fracturing valve 3 Positioning device 11, lower the ball s...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the production process of the petroleum industry, and particularly relates to a switchable cementing segmental fracturing oil production process for horizontal wells, including a floating shoe (1), a constant pressure sliding sleeve (2), and a cementing sliding sleeve segmental fracturing valve One (3), staged fracturing valve for cementing sleeve two (4), staged fracturing valve for cementing sleeve n (5), ball seat one (7), ball seat two (8), ball seat n (9), lost hand, locator one (11), fracturing ball (12), flat-bottomed grinding shoe (13), screw drill (14), check valve (15), packer one (16), seal Spacer 2 (19), locator 2 (17), throttle valve (18), and horizontal well switchable cementing staged fracturing oil production process are as follows: 1. Lowering the completion string; 2. Sending fracturing balls 3. Fracturing; 4. Drilling and removing the ball seat; 5. Closing the sliding sleeve; Quality; high construction efficiency, safe and reliable, suitable for large-scale promotion and use.

Description

Technical field [0001] The invention belongs to a production process in the petroleum industry, and particularly relates to a horizontal well switchable cementing staged fracturing oil production process. Background technique [0002] At present, there are mainly three types of horizontal well completion processes at home and abroad. The first is conventional direct casing cementing completion, string perforation, fracturing tools fracturing, and fracturing tools are proposed after fracturing is completed. , Lower the production pipe string for mining, the water is discharged later, and the water search tool is used to find the water. After the water layer is found, the water plugging pipe string is blocked. This technology has a long construction period from drilling to production. After fracturing, the fracturing tool is difficult to get out, and the well is easy to jam, causing overhaul accidents. Later, the drilling and water blocking tools are cumbersome to construct, and th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21B43/26E21B47/005
Inventor 朱玉军刘春雨张光恒张雷
Owner FUXIN CITY GASOLINEEUM TOOL FACTORY