Anti-deformation welding method for pile legs of drilling platform
A technology of drilling platform legs and welding methods, which is applied in welding equipment, metal processing equipment, manufacturing tools, etc., to achieve the effects of improving dimensional accuracy, avoiding orthopedics, and improving work efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0062] see figure 1 ,as the picture shows,
[0063] (1) The horizontal outer tube 21 and the horizontal inner tube 22 are positioned (pre-welded);
[0064] (2) Welding 1,3,5,7 layers (odd layers 20-1,20-3,20-5,20-7) horizontal outer tube 21 at the same time, each layer has a, b, c, d, e , f six welding points, a total of 24 welds; after the welding is completed, weld the horizontal outer pipe 21 of 2, 4, and 6 layers (even-numbered layers 20-2, 20-4, 20-6) at the same time, a total of 18 welding port;
[0065] (3) weld 1,3,5,7 layers of horizontal inner pipe 22 at the same time, each layer has g, h, I, j, k, l six welding points, a total of 24 welds; after welding is completed, weld simultaneously 2, 4, and 6 layers of horizontal inner pipes 22 have a total of 18 welds.
[0066] see figure 2 ,as the picture shows,
[0067] This step is very important. The diameter of the diagonal support is large, the wall thickness is large, and the welding volume is large, which can e...
Embodiment 2
[0074] see figure 1 ,as the picture shows,
[0075] (1) The horizontal outer tube 21 and the horizontal inner tube 22 are first positioned;
[0076] (2) Weld the horizontal outer tube 21 of layers 1, 3, 5, and 7 (odd layers 20-1, 20-3, 20-5, 20-7) at the same time. After the horizontal outer tube 21 has been welded, the horizontal outer tube 21 is welded simultaneously inner tube 22;
[0077] (3) Weld the horizontal outer tubes 21 of layers 2, 4, and 6 (even-numbered layers 20-2, 20-4, and 20-6) at the same time, and then weld the horizontal inner tubes 22 at the same time after the welding is completed.
[0078] see figure 2 ,as the picture shows,
[0079] First all the first oblique supports 31 on the three sides of the pile legs (each side of the pile legs is first equipped with the oblique support tube on the left side) are positioned. After the positioning is completed, weld the lower ends of all the first oblique supports 31 a, b, c, d, e, f welding at the same tim...
Embodiment 3
[0084] see figure 1 ,as the picture shows,
[0085] (1) The horizontal outer tube 21 and the horizontal inner tube 22 are first positioned;
[0086] (2) weld the horizontal outer pipe 21 of the 4th layer (20-4) earlier, then weld the horizontal outer pipe 21 of the 3rd and 5th layers (20-3, 20-5), and then weld 2, 6 layers (20- 2, 20-6), finally welding the horizontal outer tube 21 of layers 1 and 7 (20-1, 20-7);
[0087] (3) The welding sequence of the horizontal inner pipe 22 is the same as that of the horizontal outer pipe 31 , or, after the horizontal outer pipe of the corresponding step is welded, the horizontal inner pipe 22 of the corresponding position is then welded.
[0088] see figure 2 ,as the picture shows,
[0089] First all the first oblique supports 31 on the three sides of the pile legs (each side of the pile legs is first equipped with the oblique support tube on the left side) are positioned. After the positioning is completed, weld the lower ends of al...