A technology of composition and temporary plugging agent, which is applied in drilling compositions, wellbore/well components, chemical instruments and methods, etc., can solve the problem of difficult to meet the needs of acidification, fracturing construction, low softening point of wax spheres, Affecting the normal operation of oil wells, etc., to achieve the effect of improving the stimulation effect, low cost and convenient operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Example 1: Making a temporary blocking ball
[0027] Choose a viscosity of approximately 150 x 10 4 mPa.s, 180×10 4 mPa.s and 195×10 4 mPa.s crude oil (produced from Tahe, Xinjiang) and paraffin (purchased from Cangzhou Xintai Wax & Rubber Industry Co., Ltd., 70# microcrystalline wax), epoxy resin 6304 (purchased from Henan Liyuan Industrial Co., Ltd.), according to the table below The content shown in 1, heated on the injection molding machine to melt and stir it evenly, then injection molded, and after cooling, spheres with diameters of 11, 14 and 16mm were obtained.
Embodiment 2
[0028] Example 2. Temporary blocking ball melting performance test
[0029] Put three temporary plugging balls with different diameters of 11mm, 14mm, and 16mm prepared in Example 1 into crude oil samples (collected from Zhongyuan Oilfield), and place them in constant temperature water baths at 50°C, 70°C, and 90°C respectively, and record See attached table 1 for the starting time of melting and the time of complete melting.
[0030] Table 1 Statistical table of temporary blocking ball performance test
[0031]
[0032] It can be seen from the test results that the temporary plugging ball starts to melt at a temperature of about 50-90°C at a temperature of about 380 minutes-398, and about 490-560 Completely melt within minutes (equivalent to completely melt after acidizing construction), so it can well meet the requirements of conventional oil and water well acidizing construction.
Embodiment 3
[0033] Embodiment 3. Indoor temporary blockage simulation test
[0034]Using the temporary plugging simulation test device, take 1.5m diameter 76mm tubing, seal one end, and drill 4 holes with a diameter of 12mm at an azimuth angle of 90° on the tubing wall to simulate perforation blastholes. Use a rubber hose to connect tap water to inject to simulate the situation of downhole operation. It can be seen that when no temporary blocking ball is added, all the water flows out of the small hole. Then, 5 temporary plugging balls with a diameter of 12 mm prepared in Example 1 Test No. 2 were put into it, and it was found that the temporary plugging balls were carried by the water flow close to and cling to the inner side of the oil pipe hole, and were compacted on the hole due to the effect of pressure difference, thereby The small hole can be blocked, and it is observed that except for a small amount of water flowing out from the small hole that is not tightly blocked, most of the...
PUM
| Property | Measurement | Unit |
|---|---|---|
| melting point | aaaaa | aaaaa |
| melting point | aaaaa | aaaaa |
| epoxy value | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 