Preparation method of steel applied to bulldozer shovel edge
A technology for bulldozers and shovel blades, which is applied in the field of steel preparation for bulldozer shovel blades, and can solve problems such as not being able to meet the needs of use
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0024] A method for preparing steel for bulldozer blades. The chemical composition of the steel consists of the following components in weight percentage: C: 0.7, Si: 0.2, Mn: 1.2, P≤0.015, S≤0.005, Al: 0.04, Ti: 0.024, Cr: 0.4, V: 0.16, B: 0.002, and the rest are Fe and unavoidable impurities; the preparation method includes the following steps:
[0025] 1) Smelting molten steel, then casting it into a slab, heating the slab to 1210°C, keeping it warm for 2 hours, and then performing rough rolling. %; and then carry out finish rolling at 800-900°C, and the cumulative reduction rate of finish rolling should be at least 20%.
[0026] 2) The slab is subjected to water toughening treatment, the heating temperature is 960°C, the holding time is 1.5×slab thickness + 30min, and after holding the heat, put it into water with a water temperature of 65°C.
Embodiment 2
[0028] A method for preparing steel for bulldozer blades. The chemical composition of the steel consists of the following components in weight percentage: C: 0.9, Si: 0.1, Mn: 1.6, P≤0.015, S≤0.005, Al: 0.02, Ti: 0.028, Cr: 0.2, V: 0.22, B: 0.001, and the rest are Fe and unavoidable impurities; the preparation method includes the following steps:
[0029] 1) Smelting molten steel, then casting it into slab, heating the slab to 1230°C, keeping it warm for 1 hour, and then performing rough rolling. %; and then carry out finish rolling at 800-900°C, and the cumulative reduction rate of finish rolling should be at least 20%.
[0030] 2) The slab is subjected to water toughening treatment, the heating temperature is 980°C, the holding time is 1.5×slab thickness + 30min, and after holding the heat, put it into water with a water temperature of 55°C.
Embodiment 3
[0032] A method for preparing steel for bulldozer blades. The chemical composition of the steel consists of the following components in weight percentage: C: 0.8, Si: 0.15, Mn: 1.4, P≤0.015, S≤0.005, Al: 0.03, Ti: 0.026, Cr: 0.3, V: 0.18, B: 0.0015, and the rest are Fe and unavoidable impurities; the preparation method includes the following steps:
[0033] 1) Smelt molten steel, then cast it into a slab, heat the slab to 1220°C, keep it warm for 1.5 hours, and then carry out rough rolling. %; and then carry out finish rolling at 800-900°C, and the cumulative reduction rate of finish rolling should be at least 20%.
[0034] 2) The slab is subjected to water toughening treatment, the heating temperature is 970°C, the holding time is 1.5×slab thickness + 30min, and after holding the heat, put it into water with a water temperature of 60°C.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More