Pulse staggered scheduling method in phased array radar resource management

A phased array radar and resource management technology, applied in the field of time and energy resource management, can solve the problems of not considering the impact of scheduling gain on scheduling performance, and not giving the implementation method of pulse interleaving scheduling, etc., to achieve the effect of meeting real-time requirements

Inactive Publication Date: 2014-06-04
XIDIAN UNIV
View PDF3 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the specific implementation method of pulse interleaving scheduling is not given in this paper, and the influence of factors such as scheduling gain, scanning order, and scanning times in adjacent task exchanges on scheduling performance is not considered.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pulse staggered scheduling method in phased array radar resource management
  • Pulse staggered scheduling method in phased array radar resource management
  • Pulse staggered scheduling method in phased array radar resource management

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] refer to figure 1 , the realization steps of the present invention are as follows:

[0034] Step 1. Obtain and sort the requested tasks to obtain a linked list of requested tasks.

[0035] The requested tasks obtained from the task generation module of the phased array radar system are sorted from large to small according to the comprehensive priority, and the requested task linked list is obtained where R iIt is the i-th request task in the request task list, i=1,...,N, N is the request task list The number of requested tasks;

[0036] The comprehensive priority is the request task R i The parameters carried are calculated by the task generation module, which is located at the front end of the functional module of the present invention and is responsible for forming the request task R i , and calculate the request task R i The parameters; the comprehensive priority reflects the importance of the request task, and the sorting enables subsequent operations to pri...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a pulse staggered scheduling method in phased array radar resource management to mainly solve the problem that an existing pulse staggered scheduling method is difficultly applied to real-time engineering realization. The pulse staggered scheduling method comprises the first step of ranking request tasks obtained through a task generating module of a phased array radar system according to the comprehensive priority from large to small to obtain a request task chain R, the second step of sequentially traversing the request task chain R in order to carry out bi-directional greedy search scheduling to obtain an executing task chain E, the third step of sequentially traversing the executing task chain E in order to carry out three to five times of secondary scheduling scanning to obtain a final executing task chain E', and the fourth step of sending the final executing task chain E' into a task executing module of the phased array radar system. The pulse staggered scheduling method is high in real-time performance, can be conveniently applied to the engineering realization and can be used for time, energy and resource management of a phased array radar, and the good pulse staggered scheduling performance can be obtained.

Description

technical field [0001] The invention belongs to the technical field of radar, and relates to a pulse interleaved scheduling method for radar task scheduling in phased array radar resource management, which can be used for time energy resource management in phased array radar. Background technique [0002] Phased-array radar has remarkable characteristics such as beam agility, which enables a single radar to simultaneously complete multiple tasks such as search, tracking, and guidance, thus forming a multi-functional phased-array radar system. Under the control of the computer control unit, the multifunctional phased array radar system can adaptively change system parameters such as waveform parameters, so that the radar system can continuously adapt to changes in the external environment and state. However, since the available time and energy resources of the radar system are limited, the multi-functional integration of the radar system must require the radar to reasonably a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F9/46G06F9/50
Inventor 刘峥张清帅吴旭姿刘韵佛
Owner XIDIAN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products