Subway double-line tunnel lining structure manufactured through cut and cover method
A technology of lining and underground excavation, which is applied in the field of tunnels, can solve the problems of increasing project cost and increasing construction difficulty, and achieve the effects of reducing project cost, reducing the amount of reinforcement in the lining structure, and improving the force of the structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0013] Such as figure 1 The shown tunnel lining structure of the subway double-track underground excavation method includes a vault 1 and a vault 2 connected end to end, and a partition wall 5 is also arranged in the tunnel. The cross-section of the vault 1 is semicircular, and the cross-section of the vault bottom 2 is semi-elliptical. The diameter of the semicircle in the section of the vault 1 is equal to the major axis of the semiellipse in the section of the vault bottom 2 . Both the vault 1 and the vault bottom 2 are composed of primary support 3 and secondary lining 4 to form a composite lining.
[0014] During the construction of the subway double-line underground excavation tunnel, the initial support 3 shall be constructed first; when the construction conditions for the secondary lining 4 are met, the secondary lining cons...