Supplementary water barge launching construction method

A construction method and technology for replenishing water, which are applied in the directions of slipway, ship, transportation and packaging, etc., can solve problems such as controllability and control that cannot guarantee construction safety, it is difficult for the winch wire rope to not interfere, and the winch is not easy to set temporary construction power supply and other problems. , to achieve the effect of convenient and quick layout, reduce the difficulty of safety monitoring, and reduce labor costs

Inactive Publication Date: 2014-07-16
SEPCOIII ELECTRIC POWER CONSTR CO LTD +1
View PDF0 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

A total of nearly 2,000m of wire rope winding requires a lot of manpower and material resources, and aquatic plants, silt, and debris in the river water form resistance during wire rope winding, which brings many uncertain and unsafe factors
[0006] 3. Construction on the east bank of the river requires large-scale removal of vegetation. There are a large number of shrubs, bamboos and other vegetation in the open area on the east bank of the river, especially around the preset position of the hoist and extending to the river bank, making it difficult to ensure smooth progress of the construction.
[0007] 4. It is not easy to set up temporary construction power supply for the 4 winches arranged on the east bank of the river, and the cables need to be released overhead from the river surface. During the barge construction, the river water has overflowed the 105m wide dam and the current is turbulent, so there are certain risks in the construction
[0008] 5. The wire ropes of the 4 winches on the other side of the river have to cross the turbulent river of more than 60 meters to drag the barge. It is difficult to ensure that the wire ropes of multiple winches will not interfere and get mixed together
[0009] There are too many uncertain factors in this plan, and it cannot guarantee that the construction safety is under control.
If the water level of the river surface rises a lot during the construction in the rainy season, the original plan cannot be implemented smoothly.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Supplementary water barge launching construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] 1. Four winches are arranged at the four corners of the hull, the overall construction difficulty is reduced, and the placement is convenient, and the four corner winches on the ship are set to be semi-movable, which is convenient for direction adjustment during the barge shifting process.

[0026] 2. Only one steel wire rope guide ground anchor point will be constructed in the river bank construction. On the west bank of the river, two ground cattle are used as guiding ground anchor points, and on the east bank of the river, only a temporary concrete ground anchor is set.

[0027] 3. The two anchor chains at Diniu A and B are not launched with the ship. After throwing the two Hall anchors in the water, the hull moves to the shore to hoist the steel approach bridge for connection. After the hull moves to the predetermined position, use the winch on the ship to pull the shore anchor. The chain is in place.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

A supplementary water barge launching construction method is characterized in that the construction method comprises the following steps: 1, arranging four hoists at four corners of a barge body; 2, constructing only one wire rope guiding ground anchor point at the bank of a river, using two porters as guide ground anchor points at the west bank of the river, and arranging a concrete ground anchor at the east bank of the river; and 3, allowing two anchor chains of the porters A and B not to launch with the barge, throwing two Hall anchors in water, allowing the barge body to move to the bank of the river, carrying out hoisting steel bridge connection, allowing the barge body to move to a predetermined position, and using the hoists in the barge to tract the anchor chains at the bank in place. The construction method has the advantages of high efficiency, engineering amount reduction, convenient and fast construction, and construction cost saving.

Description

technical field [0001] The invention relates to the field of engineering construction, aiming at the optimal construction under background conditions such as no auxiliary tugboat and no good geographical environment during the launching process of barges. Background technique [0002] Barge launching construction generally uses the ship airbag launching process, which requires the use of auxiliary tugboats or multiple traction equipment to continuously change the direction of the barge in the water during the launching process to achieve final and accurate positioning. [0003] The construction plan given by the manufacturer is: after the pontoon hull is launched with 4 airbags, 4 winches are required to be arranged on the east and west banks of the river, and 8 winches are used to assist the pontoon to anchor at 4 anchor points, and then move to the shore. Move to the predetermined position after hoisting and connecting the steel approach bridge. The construction difficult...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): B63C3/00
Inventor 王建李俊城
Owner SEPCOIII ELECTRIC POWER CONSTR CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products