Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for enabling state monitoring information of transformer station primary main equipment to access to regulation and control system

A technology for monitoring information and control systems, which is applied in the field of substation primary equipment status monitoring information access control systems, which can solve problems that affect system reliability, lack of data fusion and automatic diagnosis technology, and increase the monitoring load of control system equipment.

Active Publication Date: 2014-09-03
STATE GRID CORP OF CHINA +1
View PDF6 Cites 35 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The action of the secondary protection equipment is often caused by sudden changes in the operating parameters of the power grid, including the action of the protection system caused by a serious fault in the operation of the primary equipment.
[0006] There are two difficulties in accessing the status information of the primary primary equipment to the control system: 1) The current control system already contains the secondary monitoring information of tens of thousands of equipment in more than a hundred substations, how to add the status information of the primary equipment to the control system 2) At present, the primary primary equipment has the conditions for online monitoring and has accumulated a large amount of operation monitoring data, but these data are limited to low-efficiency applications such as alarms, and there is still a lack of data fusion and automatic diagnostic techniques, leading to low reliability of monitoring results
If a large amount of original status information of primary equipment is directly connected to the control system, it will not only increase the load of equipment monitoring on the control system, affect the reliability of the system, but will not help to accurately judge the operating status of the equipment

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for enabling state monitoring information of transformer station primary main equipment to access to regulation and control system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0026] See figure 1 As shown, the method of the present invention for accessing the monitoring information of primary main equipment status of a substation to a control system includes the following steps:

[0027] The equipment status information collector module 1 receives the primary equipment status information of the substation (such as the information of the transformer 7, the GIS 8 and the circuit breaker 9). The collected status information includes equipment online monitoring data, manual input of offline inspection data, equipment operation history and maintenance information, and information on common family defects that appear or are likely to occur for a batch of equipment within a period of time. The device status information collector module 1 sends the received information to the device status information database module 2. The device status infor...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for enabling state monitoring information of transformer station primary main equipment to access to a regulation and control system. The method comprises steps that: the state information of the transformer station primary main equipment is received and is classified into on-line monitoring data, off-line detection data, history state information and family defect information; after pre-processing, the data is sent to a threshold diagnosis module for diagnosis; a diagnosis result of the threshold diagnosis module is sent to an expert diagnosis module; the inputted data is diagnosed through the expert diagnosis module, an operation state of the equipment is diagnosed, and a message formed from the operation state information is inputted through a second bus to a multidimensional information display module; the multidimensional information display module is used for identifying state information of the equipment in the message and carrying out classification and display. The method realizes comprehensive analysis determination on the operation state of the equipment through integration of the on-line data, the off-line data, the history information and family defects, not only diagnosis reliability of the equipment is improved, but also content transmission quantity of the message is reduced, and business processing capacity requirements for the regulation and control system is further reduced.

Description

【Technical Field】 [0001] The invention belongs to the field of power system automation, and relates to a method for accessing the control system of primary main equipment status monitoring information of a substation. 【Background technique】 [0002] The construction of smart grids in my country has gradually risen to a national strategic level, becoming an important part of national economic development and energy policies, and also becoming the development trend of future power grids. As an important foundation and support for a unified and strong smart grid, substations undertake the functions of transforming voltage levels, collecting power flow, distributing electric energy, and adjusting voltage. The development of smart substations fully embodies the core concepts and connotations of smart grids and represents the advanced substations Technology and development direction. [0003] The development of smart grid technology has also led to profound changes in the operation mode...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G05B23/02
Inventor 魏宾穆海宝郝西伟张冠军马龙涛郑昳张婷张莉
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products