Core-filled concrete pouring device and method for prestressed concrete pipe pile joints
A technology of concrete pipe piles and prestressing, which is applied to sheet pile walls, buildings, and foundation structure engineering, and can solve problems such as inconvenient pouring, cost waste, and impact on concrete strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.
[0029] refer to Figure 5, the first embodiment of the core-filled concrete pouring device 4 at the joint of the prestressed concrete pipe pile of the present invention is suitable for cooperating with two prestressed concrete pipe piles 3 . Each prestressed concrete pipe pile 3 includes a hollow cylindrical surrounding wall 31 surrounding a receiving area 310 , and an annular end plate 32 disposed at one end of the surrounding wall 31 . When connecting the piles, the two prestressed concrete pipe piles 3 are connected in the manner of upper and lower end connections, so that the two end plates 32 are superimposed on each other, and the two end plates 32 are connected by welding, and the two prestressed concrete pipe piles 3 are connected by welding. The surrounding walls 31 of the concrete pipe pile 3 jointly surround an accommodating space 30 .
...
PUM