Slagging equipment after slagging and smelting and its use method
An equipment and slag-making technology, which are applied in the field of slag-removing equipment after slag-making and smelting, can solve the problems of difficult separation, polysilicon mixed with slag agents, etc., and achieve the effects of effective slag removal and dumping, reducing energy consumption, and reducing the danger of workers' operation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Such as figure 1 The shown slag extraction equipment after slagging and smelting includes a cantilever crane 1, a cantilever 2 is fixedly installed on the cantilever crane 1, a wire winding machine 3 is fixedly installed on the cantilever 2, and the wire winding machine 3 is suspended and connected with a slag storage device 5, wherein a closed cavity is formed between the inner wall and the outer wall of the slag storage device 5, and the water inlet pipe 12 and the water outlet pipe 11 are connected to the closed cavity, and the slag storage device 5 communicates with the vacuum tank 17 through a vacuum bellows 16, Also communicate with gas cylinder 21 by blowing pipe 19, wherein vacuum tank 17 is connected with vacuum pump 13 by connecting pipe 14, and the bottom of slag depositor 5 is communicated with graphite tube 6, and the outlet end bottom of graphite tube 6 is placed with graphite crucible 7, graphite The outer wall of the crucible 7 is wound with an induction...
Embodiment 2
[0029] Use the equipment described in embodiment 1 to get slag:
[0030] The first step of pretreatment: Put the silicon material and slag material into the graphite crucible 7, start the power supply of the induction coil 8, and heat the silicon material and slag material in the graphite crucible 7 to 1500°C until they are completely melted into a molten state to form silicon liquid 10 and slag agent 9, and keep warm at this temperature for 30 minutes;
[0031] The second step is to inflate: control the winding machine 3 to lower the slag storage device 5 until the bottom of the graphite tube 6 drops to the bottom of the silicon liquid 10, then open the gas valve 18 to pass the gas 20 into the molten silicon liquid 10, Make the gas 20 fully react with the molten silicon liquid 10;
[0032] The third step of slag removal treatment: after the inflation process is completed, close the gas valve 18, control the winding machine 3 to make the slag depositor 5 drive the graphite tu...
Embodiment 3
[0038] Use the equipment described in embodiment 1 to get slag:
[0039] The first step of pretreatment: Put the silicon material and slag material into the graphite crucible 7, start the power supply of the induction coil 8, and heat the silicon material and slag material in the graphite crucible 7 to 1500°C until they are completely melted into a molten state to form silicon liquid 10 and slag agent 9, and kept at this temperature for 50 minutes;
[0040] The second step is to inflate: control the winding machine 3 to lower the slag storage device 5 until the bottom of the graphite tube 6 drops to the bottom of the silicon liquid 10, then open the gas valve 18 to pass the gas 20 into the molten silicon liquid 10, Make the gas 20 fully react with the molten silicon liquid 10;
[0041] The third step of slag removal treatment: after the inflation process is completed, close the gas valve 18, control the winding machine 3 to make the slag depositor 5 drive the graphite tube 6 ...