A technology of steel-concrete combination and installation method, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of narrow space, many joints, difficult welding of welds, etc., and achieves short on-site operation time, broad promotion value, The effect of high construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0021] according to figure 1 , figure 2 and image 3 As shown, a method for installing PBL shear keys in a steel box girder 1 for a steel-concrete joint section. The segmental beam body is assembled and welded. The left beam body 3, the middle beam body 4 and the right beam body 5 respectively include a plurality of passing shear plates arranged at intervals, and each passing shear plate is provided with a plurality of PBL shear force The key installation holes and the PBL shear key installation holes are opposite to each other, forming multiple sets of PBL shear key installation holes;
[0022] Include the following steps:
[0023] a, according to the structure of the steel box girder 1, the length characteristics carry out segment blanking to the PBL shear key to make the PBL shear key segment 2, and thread at the end of the PBL shear key segment 2; in the present invention , the PBL shear key is made of steel bars.
[0024] b. Install two sections of PBL shear key seg...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 