A production platform and self-elevating technology, which is applied in shipbuilding, construction, ship parts, etc., can solve the problems of prolonging the construction period of the dock and the difficulty of building a double-deck platform, so as to improve the utilization rate of the dock, shorten the construction period, and achieve high efficiency. Economical effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] attached Figure 2-8 It is a schematic diagram of the construction process of the self-elevating production, storage and offloading platform split dock. The entire construction process is decomposed into 7 main processes, respectively through Figure 2-8 Expressed, the main construction process is as follows:
[0017] figure 2 It reflects that the production platform 1 is built on land at one side of the dock; the storage cabin platform 2 is built at the dock.
[0018] That is, step 1, construction of dual independent platforms: the production platform 1 and the storage cabin platform 2 start construction independently at the same time, the storage cabin platform 2 is built on pier in the dock, and the production platform 1 is built on the land beside the dock;
[0019] image 3 It reflects that the production platform 1 has been completely built on land on the side of the dock, including pile legs 3, and the lifting system has been debugged. The road 7 extends to...