Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A construction method for the support of multi-arch tunnel without chamber and large pipe shed

A technology for multi-arch tunnels and construction methods, which is applied in tunnels, tunnel linings, underground chambers, etc., can solve problems such as difficulty in switching construction steps, increased construction risk levels, and increased construction difficulty, so as to ensure operational comfort and reduce costs. The effect of small expansion of earth volume and reduction of construction excavation

Active Publication Date: 2016-04-06
中铁二院重庆勘察设计研究院有限责任公司
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] 1. The increased excavation section and repeated changes in the excavation section can easily cause stress concentration and increase the construction risk level, which is not conducive to safe construction
[0006] 2. The amount of excavated earthwork increases, the amount of initial support increases, and the cost of the project increases
[0007] 3. For the multi-cycle continuous large pipe shed construction site, the pipe shed workshop must be excavated in each cycle, which is difficult to construct and affects work efficiency
[0008] 4. When the second lining is constructed after the tunnel excavation is completed, it not only increases the amount of concrete, but also affects the second lining formwork trolley
[0010] 1. The expansion and excavation of the pipe shed studio will occupy the structural space of the middle wall of the multi-arch tunnel. If the thickness of the middle wall structure is kept constant, the line will be widened, resulting in irregular lines, irregular structures, increased construction difficulty, engineering volume and investment. increase etc.
If the line is kept straight and unchanged, the expansion and excavation will encroach on the thickness of the middle wall structure, which will bring about problems such as structural safety, structural irregularities, and increased temporary reinforcement and support works.
[0011] 2. The expansion and excavation of the pipe shed studio will cause the adjacent hole space to be occupied, resulting in complex structural design, difficulty in switching construction steps, and low construction efficiency.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method for the support of multi-arch tunnel without chamber and large pipe shed
  • A construction method for the support of multi-arch tunnel without chamber and large pipe shed
  • A construction method for the support of multi-arch tunnel without chamber and large pipe shed

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] Below in conjunction with accompanying drawing and embodiment the present invention will be further described:

[0036] A construction method for supporting a multi-arch tunnel body without a large pipe shed, comprising the following steps:

[0037] 1) Build a composite guide wall and install a guide pipe 4 at the face P of two tunnels 1 arranged side by side: the composite guide wall includes a sprayed concrete layer 2 and a poured concrete layer 3, and the sprayed concrete layer 2 The pouring concrete layer 3 is distributed along the arc profile of the top of the tunnel 1, and the pouring concrete layer 3 is located inside the sprayed concrete layer 2; the initial support steel frame 5 is arranged in the sprayed concrete layer 2, and the initial support steel frame 5 is The frame structure is composed of parallel I-beams and steel bars connected between two adjacent I-beams; a temporary steel frame 6 is arranged in the pouring concrete layer 3, and the temporary steel...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for constructing a multiple-arch tunnel hole body large room-free pipe shed support. The construction working procedures comprise composite guide wall construction and guide pipe mounting, drilling, large pipe shed and reinforcement cage mounting, composite type guide wall casting concrete layer breaking and removing, discarded drilled segment soil excavation, grouting, large pipe shed supporting segment excavation, next circular construction and the like. The method avoids multi-cycle repeated expanding excavation of a pipe shed working room in a multiple-arch tunnel, reduces construction risks, the expanding excavation earth volume, the use amount of primary supporting second lining concrete and the number of steel arches and saves engineering cost; the construction speed is improved, and the working efficiency is greatly improved; the construction risks like the possibly-caused tunnel damage caused by stress concentration and the like due to the fact that a cross section is expanded and the pipe shed working room is excavated in the weak poor stratum are reduced, and the influence of urban narrow underground space on near existing constructed (built) buildings is reduced; and compared with a traditional pipe shed advance support with the working room, the whole advance support and tunnel excavation process is safer and more reliable.

Description

technical field [0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a construction method for supporting a multi-arch tunnel body without a large pipe shed. Background technique [0002] In order to control the relaxation of the surrounding rock in a large range, a special reinforcement method is required. This method is to first carry out reinforcement construction in the surrounding rock in front of the tunnel face, and then carry out excavation within its range. This method The construction method is called advance support. [0003] Pipe shed support is an advanced support method when passing through shallow buried, weak and broken rock masses, collapsed sections and other unfavorable geological layers in underground engineering construction. The support of the pipe shed is to drill a hole along the excavation circle line with a certain external angle with the tunnel axis. Then insert steel pipes of different diameter...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/10E21D11/00E21D11/10
CPCE21D9/10E21D11/00E21D11/10
Inventor 张万斌李海军曹林卫王明年刘大刚付刚于茂春朱小兵李鸿王志勇姜波
Owner 中铁二院重庆勘察设计研究院有限责任公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products