A space-staggered and inter-embedded technology, applied in the fields of civil engineering, transportation and waterway engineering, can solve problems such as single construction slope and complex block type, and achieve the effects of convenient processing, low cost, good ecological benefits and economic benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] In Example 1 and Example 2, the main inter-embedded ecological block A1 and the auxiliary ecological block A2 are used to assemble the retaining wall, and in Example 3, the main inter-embedded ecological block B1 and the auxiliary ecological block B2 are used to assemble the retaining wall , In embodiment 4, the main inter-embedded ecological blocks A1, B1 and auxiliary ecological blocks A2, B2 are used to assemble the retaining wall.
[0047] Such as figure 1 As shown, the main inter-embedded ecological block A1 consists of front and rear parallel panels a1 (5), a2 (6) and left and right ribs a3 (7) and a4 (8) connecting the front and rear panels composition, the length of the front panel a1(5) is greater than the length of the rear panel a2(6), and the left and right ribs a3(7) and a4(8) are respectively connected to the front and rear panels a1(5) and a2(6) The inner sides of both ends form the front and rear cantilevers a5 (9), a6 (10), the front and rear panels a1...
Embodiment 2
[0059] The above-mentioned main inter-embedded ecological block A1 and auxiliary ecological block A2 are used to assemble the retaining wall as follows Figure 9 The construction method of the steep slope curved retaining wall includes the following steps:
[0060] 1) Construction laying out, leveling the foundation, and laying the foundation of the retaining wall;
[0061] 2) Lay the ground floor blocks above the foundation, arrange the main inter-embedded ecological blocks A1 and the auxiliary blocks A2 staggered and horizontally, and attach the outer surfaces of the two front cantilevers of each block to the inner surfaces of the front cantilevers of the blocks on both sides According to the design requirements, a certain angle (not 0 degrees) is set between adjacent blocks, and then the through holes of the blocks and the back of the retaining wall are filled with soil or gravel to the height of the auxiliary ecological block A2, and the whole is manually rammed. Backfill...
Embodiment 3
[0067] The above-mentioned main inter-embedded ecological block B1 and auxiliary ecological block B2 are used to assemble the retaining wall as follows Figure 10 The construction method of the shown gentle slope straight retaining wall includes the following steps:
[0068] 1) Construction laying out, leveling the foundation, and laying the foundation of the retaining wall;
[0069] 2) Lay the ground floor blocks above the foundation, arrange the main inter-embedded ecological blocks B1 and auxiliary blocks B2 in a staggered horizontal direction, and attach the outer surfaces of the two front cantilevers of each block to the inner surfaces of the front cantilevers of the blocks on both sides According to the design requirements, the angle between adjacent blocks is set to 0 degrees, and then the through holes of the blocks and the back of the retaining wall are filled with soil or gravel to the height of the auxiliary ecological block B2, and the backfill of the wall is artif...