A construction method and dock technology, applied in the field of surveying and mapping, can solve problems such as reducing the safety factor of the site, making it difficult to form a three-dimensional overall control of ships to be built and marine engineering equipment, and affecting the accuracy of measurement work, so as to improve production efficiency, shorten the dock cycle, The effect of improving the safety factor
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] Such as figure 1 As shown, the present invention provides a kind of construction method of digital shipyard, comprises the steps:
[0047](1) Carry out on-site survey of the location of the point layout and the dock utilization cycle, design and lay out the reference control points of the digital dock according to the site conditions and shipbuilding progress, and arrange a pair of reference control points at intervals of 40 to 60 meters along both sides of the dock point;
[0048] (2) if figure 2 As shown, the stability monitoring of the reference control point is carried out; a high-precision total station is set up at point A, and peripheral stable points P1 and P2 are selected as monitoring references, and P1, P2, 1, 2, ... n A total of n+2 direction angles, zenith distances, and slant distances. The displacement of each point is obtained by comprehensive calculation of the data of each period; the displacement of each point is calculated by formula (1):