Multi-power-grid-oriented hydropower station short period peak load regulation characteristic value searching method

A search method and technology of hydropower stations, which are applied in the field of short-term peak regulation characteristic value search of hydropower stations, can solve problems such as limited peak regulation capacity, limited power generation capacity, and inability to obtain peak regulation effects for the power grid, achieving high calculation efficiency, fast calculation speed, Significant effect of efficiency improvement
CN104636831AActive Publication Date: 2015-05-20HUAZHONG UNIV OF SCI & TECH

Patent Information

Authority / Receiving Office
CN · China
Current Assignee / Owner
HUAZHONG UNIV OF SCI & TECH
Publication Date
2015-05-20

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a multi-power-grid-oriented hydropower station short period peak load regulation characteristic value searching method, and belongs to the technical field of hydroelectric energy optimized operation and electrical power system electricity generation optimized dispatching. With the maximal and minimal values of each electricity receiving power grid residual load as a characteristic value, the output at the period of time of the characteristic value is adjusted gradually in a characteristic value limit range, and the electricity receiving process of each power grid is corrected gradually in order to meet the hydropower station operation limit requirement. Multi-power-grid short period peak regulation is divided into two scheduling modes of a non-abandoned water mode and an abandoned water mode according to available water quantity of a scheduling period. Under the non-abandoned water mode, based on the consideration of power grid typical load characteristic and peak regulation requirement, under the precondition that a lower course comprehensive water usage demand is met, hydropower station peak regulation capacity gain is exerted as much as possible, more electricity is generated at electricity utilization peak and less electricity is generated at electricity utilization valley; under the abandoned water mode, the hydropower station is in fully loaded running, under the requirement of appointed power grid distribution ratio, with minimal rest load variance as a target, a power grid electricity receiving plan is made by a classical particle swarm optimization algorithm.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field

[0001] The invention belongs to the technical field of optimized operation of hydropower energy and optimized dispatching of power generation of a power system, and more specifically, relates to a method for searching the short-term peak shaving characteristic value of a hydropower station facing multiple power grids. Background technique

[0002] Large-scale hydropower stations currently under construction or in operation, such as Xiluodu, Xiangjiaba, Ertan Hydropower Station, etc., all transmit power to multiple provincial power grids at the same time. However, due to the load level, peak and valley occurrence periods, and peaks of each provincial power grid, The valley difference is different. These hydropower stations need to fully consider the load characteristics of each power grid when formulating their output plans to dynamically respond to the peak regulation requirements of each power grid.

[0003] The current short-term peak shaving of hydropower station...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine