Multi-power-grid-oriented hydropower station short period peak load regulation characteristic value searching method
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- HUAZHONG UNIV OF SCI & TECH
- Publication Date
- 2015-05-20
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
Technical field
[0001] The invention belongs to the technical field of optimized operation of hydropower energy and optimized dispatching of power generation of a power system, and more specifically, relates to a method for searching the short-term peak shaving characteristic value of a hydropower station facing multiple power grids. Background technique
[0002] Large-scale hydropower stations currently under construction or in operation, such as Xiluodu, Xiangjiaba, Ertan Hydropower Station, etc., all transmit power to multiple provincial power grids at the same time. However, due to the load level, peak and valley occurrence periods, and peaks of each provincial power grid, The valley difference is different. These hydropower stations need to fully consider the load characteristics of each power grid when formulating their output plans to dynamically respond to the peak regulation requirements of each power grid.
[0003] The current short-term peak shaving of hydropower station...