A whole-span box girder demolition system based on bridge deck support and its construction method
A construction method and box-crossing technology, applied in bridges, bridge maintenance, bridge reinforcement, etc., can solve the problems of high cutting costs, increased hoisting weight, difficult hoisting and transportation, etc., to reduce cutting area, reduce demolition costs, and have good application prospects. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] Such as Figure 1-8 As shown, the whole-span box girder demolition system based on bridge deck support uses the pier column 1 as the bearing support, and the pier column 1 as the support point of the lowered box girder 2 to complete the demolition of the entire large-tonnage bridge. Among them, two sets of cantilever reaction force systems symmetrically arranged at both ends of the lowered box girder 2 are included. The cantilever reaction force system includes two main cantilever beams 5 and slings 6 .
[0033] Such as figure 2 As shown, the two main cantilever beams 5 are arranged horizontally, in a mutual horizontal or "eight" arrangement, and one of the similar ends is anchored on the pier column 1, and the ends of the main cantilever beams 5 are connected with steel wire ropes, which pass through the box girder and the pier The fixed structure on the column 1 is connected, and the fixed structure on the pier column 1 is connected with the pier column 1 by bolts o...
PUM