Ceiling joist and double-layer construction platform integrated structure and manufacturing method thereof

A technology of construction platform and keel, which is applied in the direction of housing structure support, housing structure support, and scaffolding supported by housing structure, etc., can solve the problems of prolonging the construction period, cannot be carried out at the same time, and cannot be parallelized at the same time, so as to save construction period and material. , the effect of short production and construction period

Active Publication Date: 2015-09-02
CHINA CONSTR SECOND ENG BUREAU LTD +1
View PDF12 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide an integrated structure of a suspended ceiling keel and a double-layer construction platform and a manufacturing method thereof, and provide a high-altitude operation platform to solve the problem that parallel flow construction cannot be carried out simultaneously when a full-scale scaffolding is used in the construction of a super high-altitude large-span ceiling. The construction and low-altitude area construction cannot be carried out at the same time, and the ceiling pipeline construction and ceiling slab construction cannot be carried out at the same time, which greatly prolongs the technical problem of the construction period

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Ceiling joist and double-layer construction platform integrated structure and manufacturing method thereof
  • Ceiling joist and double-layer construction platform integrated structure and manufacturing method thereof
  • Ceiling joist and double-layer construction platform integrated structure and manufacturing method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The principles and features of the present invention are described below in conjunction with the accompanying drawings, and the examples given are only used to explain the present invention, and are not intended to limit the scope of the present invention.

[0037] Such as figure 1 , figure 2 and image 3 , an integrated structure of a suspended ceiling keel and a double-layer construction platform, which is hoisted on a roof steel beam 1 of a high-rise large-span structure, and is characterized in that: from top to bottom, the top is fixed to the roof steel beam 1 through a first connecting piece 12 Several upper platform suspenders 2 connected, the upper platform beam 3 connected to the bottom end of the upper platform suspender 2 through the second connecting piece 13, the ceiling suspender 4 connected with the upper platform beam 3 by bolts at the top, and the third connecting piece 14 are connected The ceiling keel 5 at the bottom of the ceiling boom 4, the lowe...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a ceiling joist and double-layer construction platform integrated structure and a manufacturing method thereof. The ceiling joist and double-layer construction platform integrated structure comprises roof surface steel beams, upper layer platform suspension rods, upper layer platform beams, suspended ceiling suspension rods, suspended ceiling joists, lower layer platform suspension rods and lower layer platform beams, wherein scaffold boards are laid on all the upper layer platform beams and the lower layer platform beams to form double layers of construction platforms, suspended ceiling pipeline conduction is conducted by constructors on the upper layer platform, suspended ceiling board installation is conducted by constructors on the lower layer platform, and the construction on the upper layer platform and the lower layer platform are conducted at the same time; all members can be prefabricated in factories and assembled in site, and the manufacturing is simple; special connecting pieces are selected according to characters of each joint, materials of the members are selected according to load-bearing, the strength is guaranteed, and meanwhile the construction safety is guaranteed; the all-round scaffolds are not needed to be set up, the materials are saved, the space is saved, interruption to the lower attitude area can not be caused, the construction period is shortened, and the economic benefit is obvious; the ceiling joist and double-layer construction platform integrated structure can be used both as the suspended ceiling construction platforms and the suspended ceiling joists, only the lower layer platform suspension rods and the lower layer platform beams are needed to be detached after the suspended ceiling construction is finished, the practicability is high, and the ceiling joist and double-layer construction platform integrated structure is particularly suitable for the high-rise long-span suspended ceiling construction.

Description

technical field [0001] The invention relates to the technical field of high-altitude suspended ceiling construction, in particular to an integrated structure of a suspended ceiling keel and a double-layer construction platform and a manufacturing method thereof. Background technique [0002] At present, large-span projects such as large-scale indoor playgrounds are gradually emerging. The indoor ceiling height is high, the span is large, and the ground facilities are complex. In the existing technology, most of the construction lines can adopt the traditional full-house scaffolding method, which cannot be constructed in parallel at the same time. It is not suitable for construction sites with large super-high spans and complex ground facilities. On the one hand, the construction of the upper layer and the construction of the low-altitude area cannot be carried out at the same time. Simultaneously, the construction period is greatly extended. Therefore, how to realize the con...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E04B9/06E04B9/18E04G3/22
Inventor 武建乐杨瑞增张辉尹志鸿姜桃红张福英冯宇同
Owner CHINA CONSTR SECOND ENG BUREAU LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products