Method for treating tunnel collapse through dugand covered method
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- CHINA RAILWAY 19TH BUREAU GRP SECOND ENG CO LTD
- Publication Date
- 2015-11-11
Abstract
Description
Technical field:
[0001] The invention relates to the field of construction engineering, in particular to a method for treating tunnel collapse by sealing the tunnel face and pumping concrete to fill first and then dig. Background technique:
[0002] Safety accidents caused by tunnel collapse treatment are one of the biggest safety hazards in the tunnel construction process. In order to ensure project safety, open cut methods are generally used to deal with tunnel collapse for construction. If the site conditions are simple, you can choose the most cost-effective slope opening However, when the site conditions are limited, it is necessary to select vertical enclosures such as underground diaphragm walls and bored piles according to the buried depth of the tunnel project, and to add the construction of the internal support structure. The construction period is also difficult to guarantee.
[0003] At present, the specific plan for dealing with the tunnel collapse is as follow...