Real-time scheduling method for reservoir group water supply and transfer system

A technology for reservoir groups and water transfer, applied in instruments, data processing applications, forecasting, etc., can solve problems such as conservative scheduling decisions and insufficient use of hydrological forecast information.

Active Publication Date: 2015-11-25
CHINA WATER NORTHEASTERN INVESTIGATION DESIGN & RES
View PDF2 Cites 25 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The invention provides a real-time scheduling method for the water supply and transfer system of reservoir groups to solve the problem that the hydrological forecast information is not fully utilized during scheduling, and the scheduling decision-making is conservative. By

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Real-time scheduling method for reservoir group water supply and transfer system
  • Real-time scheduling method for reservoir group water supply and transfer system
  • Real-time scheduling method for reservoir group water supply and transfer system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0062] Include the following steps:

[0063] (1) Forecasting of inflow runoff, the forecast period of inflow runoff includes long-term in years or months and mid-term in ten days, using the method of long-term inflow runoff forecasting for reservoir group supply and water transfer system based on transcendence probability to predict long-term inflow The runoff is forecasted on a rolling basis, while the medium-term inbound runoff forecast adopts the rolling forecast method of inbound runoff based on GFS rainfall information. The specific steps of inbound runoff forecasting are as follows:

[0064] (a) A method for forecasting long-term inflow runoff of reservoir group supply and water diversion systems based on transcendental probability. The specific steps are as follows:

[0065] ① Select the total amount of runoff that has occurred in the year as the predictor (Z j ), for the inflow runoff in the rest of the year (Q i ) qualitative forecast of the situation;

[0066] ② A...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a real-time scheduling method for a reservoir group water supply and transfer system and belongs to the field of reservoir scheduling operation. The scheduling method comprises in-reservoir runoff forecasting and water demand forecasting, scheduling method and real-time correction. According to the characteristics of the reservoir group water supply and transfer system, an in-reservoir runoff forecasting method, an optimal scheduling modeling solving method, coupling and nesting modes in different time periods and system real-time scheduling specific flow are designed; and with the water demands of different users being taken into consideration, and under the precondition of guaranteeing water supply safety, water sources are allocated optimally, and maximizing of water supply benefits is realized.

Description

technical field [0001] The invention relates to the field of scheduling operation, in particular to a real-time scheduling method for reservoir group supply and water transfer systems. Background technique [0002] The uneven distribution of water resources and the unbalanced water demand of human society make inter-basin water transfer inevitable. At present, the cross-basin water transfer projects that have been planned or are being implemented include the South-to-North Water Diversion Project, the Central Jilin Water Diversion Project, and the River and Reservoir Water System in Liaoning Province. China Unicom Engineering, etc. In order to alleviate the contradiction between the supply and demand of water resources in North China and Northwest my country, the country has implemented a large-scale South-to-North Water Diversion Project; in order to alleviate the contradiction between supply and demand of water resources in the central part of Jilin Province, ensure the pe...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/04G06Q50/06
Inventor 徐岩彬孙万光李成振徐小武姜彪王槟郭东浦王德库范宝山陈晓霞张志崇盛杰朱新华杨辉刘宇航石瑞花宣淼宗原
Owner CHINA WATER NORTHEASTERN INVESTIGATION DESIGN & RES
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products