Prefabricated installation method of π-shaped steel frame on the arch of upward-supporting arch bridge

A prefabricated installation, π-type technology, applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of long construction period affecting the transportation of other components, affecting the transportation of other components, etc., to achieve a reasonable and reliable prefabricated installation method and avoid safety risks. and construction period risks, overcoming the effect of prefabrication that cannot be moved laterally

Inactive Publication Date: 2017-03-08
CHINA RAILWAYS CORPORATION +2
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In order to solve the problem that the existing π-shaped rigid frame construction has a long construction period and affects the transportation of other components, the present invention provides a prefabricated installation method for the π-shaped steel frame on the arch of an upward-supporting arch bridge
[0006] With this prefabricated installation method, the π-shaped rigid frame is prefabricated outside the cable hoisting area, which eliminates the interference phenomenon caused by the simultaneous operation of the π-shaped rigid frame and the bridge pier on the arch, and the construction efficiency has been effectively improved, overcoming the existing π-shaped rigid frame. There is a problem that the long construction period affects the transportation of other components in the construction of the rigid frame

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated installation method of π-shaped steel frame on the arch of upward-supporting arch bridge
  • Prefabricated installation method of π-shaped steel frame on the arch of upward-supporting arch bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0011] The prefabricated installation method of the π-shaped steel frame on the arch of the upward-supporting arch bridge adopts the following steps: a, making a prefabricated tire frame, the prefabricated tire frame includes supporting columns 1, and adjacent supporting columns 1 are provided with cross-connected Reinforcing ribs 2, and the top of the supporting column 1 is provided with a longitudinal beam 3, the top of the longitudinal beam 3 is provided with a square wooden beam 4, and the top of the square wooden beam 4 is laid with a wooden bottom form 5 with connection holes, which is used for prefabrication and storage of π-shaped Steel frame; b. Construction of π-shaped rigid frame. After all the prefabrication of π-shaped rigid frame is completed, it will be hoisted and turned by automobile crane, and transported horizontally to the lifting area by flatbed transport vehicle; c. Described temporary support pier comprises the shaped steel column 7 and the column diagona...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention specifically discloses a precasting and mounting method of a pi-shaped steel frame on an arch of a deck type arch bridge. The precasting and mounting method solves the problem that the transportation of other structural components is influenced because the period of the construction of a conventional pi-shaped steel frame is long. The precasting and mounting method comprises the following steps: a, manufacturing a precast mould frame for precasting and storing the pi-shaped steel frame; b, constructing the pi-shaped steel frame, when the pi-shaped steel frame is completely precast, adopting a vehicle to hoist and steer, and laterally transporting the steered pi-shaped steel frame to a hoisting region so as to steer the transported pi-shaped steel frame with a flat transport vehicle; and c, constructing provisional supporting piers for being supported on two sides of a web plate of the pi-shaped steel frame on bridge locations, hoisting the precast pi-shaped steel frame on the provisional supporting piers with a cable hoister so as to perform wet connecting operation, and after the wet connecting operation is completed, dismantling the provisional supporting piers so as to complete the precasting and mounting operation of the pi-shaped steel frame. The precasting and mounting method disclosed by the invention is reasonable and reliable, a hoisting bracket is not needed, security risks and construction period risks of the construction of the pi-shaped steel frame on the bridge locations are avoided, movable hoisting equipment is flexibly used so as to be matched with the construction, and the problem that the precast pi-shaped steel frame cannot be horizontally moved is solved.

Description

technical field [0001] The invention relates to a construction method for a steel frame on an arch bridge, in particular to a method for prefabricating and installing a π-shaped steel frame on an arch of an upward-supporting arch bridge. Background technique [0002] The π-shaped rigid frame is located in the mid-span of the vault of the arch bridge. It is used for high-altitude and river-crossing operations. The working environment is poor and the space is limited, but the owner has tight deadlines. When working on the arch, the transportation of materials and machinery can only be carried by the cable crane. The π-shaped rigid frame and the pier on the arch are operated at the same time, and the cable crane cannot frequently take care of the construction of the π-shaped rigid frame. The vault is far away from the shore, the concrete cannot be pumped, and the speed of the cable crane is slow, the concrete cannot be mixed during transportation, and the performance of the con...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
Inventor 王建军高荣峰李勇任亚杰王振姚予东刘文杰贾占磊尹国梁王雷王颜鑫
Owner CHINA RAILWAYS CORPORATION