Construction method of cast-in-place column prefabricated beam-slab structure
A construction method and prefabricated beam technology, which is applied in the direction of building structure and construction, can solve problems such as cumbersome connections, quality defects, and complicated connections, and achieve the effect of avoiding cumbersome connections, strong integrity, and fast and efficient construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] In the first step, the frame column 1 is formed by pouring at the construction site, and the corbel 2 protrudes from the joint of the frame column 1 and the main beam 5 on the column, and the corbel 2 and the beam head of the main beam 5 are connected. Three connecting high-strength bolt embedded parts 3 in the shape of a product are embedded on the supporting surface; three connecting holes 4 are set on the beam head of the main beam 5, and the three connecting holes 4 are matched with the three high-strength bolt embedded parts 3 , Two hoisting hooks are reserved for the prefabricated beam. When the prefabricated beam is hoisted, the high-strength bolt embedded part 3 penetrates into the reserved hole 4, and the gap in the hole is filled with high-strength grouting material to ensure that it meets the seismic requirements.
[0019] The second step is to solve the connection between the main beam 5 and the secondary beam 6. When the main beam 5 is prefabricated, at the ...