A pre-tensioned prefabricated beam-slab integral tensioning system
A technology of overall tensioning and pretensioning, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the waste of steel hinge lines, steel hinge lines cannot be reused, and it is difficult to ensure the efficiency and efficiency of pre-tensioned prefabricated beams. Quality and other issues, to achieve the effect of good efficiency and quality, simple and practical structure, safe and reliable use
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0014] Such as figure 1 with figure 2 As shown, a pre-tensioned prefabricated beam-slab overall tensioning system is composed of a pedestal 2, a steel hinge line 3, a jack 19 and a tensioning oil pump 20. The overall tensioning system of the pre-tensioned prefabricated beam and slab includes the middle structure, the left structure and the right structure:
[0015] In the middle structure, the pedestal is arranged in the middle of two L-shaped butt joint force transmission columns 1 . The pedestal is provided with a steel hinge line for preparing pre-tensioned beam slabs. The steel crossbeam 13 at the anchoring end and the steel crossbeam 14 at the tensioning end are respectively located at the outer ends of both sides of the force transmission column.
[0016] In the structure on the left side, a steel plate 21 is provided between the steel beam 13 at the anchoring end and the side of the force transmission column on the corresponding side. The role of the steel plate is ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

