Construction method of comprehensive treatment structure for subgrade freezing damage in alpine region
A construction method and technology in alpine areas, applied in the directions of roads, roads, side ditch/curbstone, etc., can solve problems such as endangering traffic safety, increasing maintenance costs, destroying pavement structure, etc. effect of the method
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The present invention will be further described below in conjunction with the accompanying drawings. This embodiment focuses on the embodiment of the structure of the present invention.
[0029] figure 1 It represents the structural layout of the comprehensive treatment of subgrade frost damage in the alpine region. As shown in the figure, the subgrade frost damage comprehensive treatment structure mainly includes: pavement 4, side ditch 1, concrete layer 2, side ditch 5, mortar rubble slope protection 6, intercepting ditch 7, insulation layer filling 9, plastic waterproof board 10 and The blind ditch is composed of: the side ditch 1 and the side ditch 5 are located on both sides of the road surface 4, the side ditch 1 is located on the concrete layer 2, the intercepting ditch 7 is located between the natural slope 8 and the masonry rubble slope protection 6, the concrete layer 2 and the The road surface 4 is connected by the road shoulder 3, the mortar-laying rubble s...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

