Segment Pulling Device and Construction Method for Initial Construction of Shield Tunnel
A technology of shield tunneling and segments, which is applied in tunnels, tunnel linings, shaft equipment, etc., can solve the problems of unstable synchronous grouting grout settlement, broken segments, and broken screws, etc., to solve the problem of segment pull connection problem effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] Below in conjunction with specific embodiment, further illustrate the present invention.
[0021] The invention relates to a segment pulling device and a construction method for initial construction of a shield tunneling method. During the initial construction of the shield tunnel, due to the small friction between the segment and the soil, the settlement of the synchronous grouting slurry is not stable, and the rigidity of the back system of the shield is not uniform, in order to prevent the formed segment This device is specially invented for the displacement of the whole to the position of the working well, which will cause the axis of the tunnel to deviate, the segment to be broken, water to leak, and the screw to be broken.
[0022] Such as Figure 1 to Figure 9 As shown, the initial construction segment pulling device of the shield tunneling method of the present invention includes the following parts: steel box 1, manual hydraulic through-hole jack 2, anchor pla...