A pile sinking construction method for prefabricated concrete sheet piles
A technology of prefabricated concrete slabs and construction methods, applied in sheet pile walls, foundation structure engineering, construction, etc., can solve the problem of failure to reach the design elevation of pile bottom embedding, pile body inclination and pile top plane displacement, affecting the structure of sheet pile walls Stability and other issues, to achieve the effect of good penetration adaptability, excellent pile quality, and simple organizational measures
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Example 1: (1) Use a crane to lift the sheet pile vertically to the pile position for preliminary positioning, and use the sheet pile’s own weight to insert into the soil layer; (2) Use the erecting device to clamp the sheet pile body, adjust the verticality and adjust the construction axis (3) After the calibration and straightening is completed, loosen the hook of the crane to lift the pile, lift the hydraulic impact piling hammer, and put the pile top steel cap at the lower end of the hammer head into the pile top; (4) Put the pile top into After that, carry out pile driving construction, observe the verticality of the pile sinking at any time during the driving process, control the sheet pile to maintain vertical pile sinking through the centralizing device, and check the verticality of each direction every 0.5 meters of pile sinking; (5) Design the distance between sinking pile and pile top When the elevation is 2 meters, loosen the centralizing device and continue ...
Embodiment 2
[0038]Embodiment 2: (1) Use a crane to lift the sheet pile vertically to the pile position for preliminary positioning, and use the sheet pile's own weight to insert into the soil layer; (2) Use the erecting device to clamp the sheet pile body, adjust the verticality and adjust the construction axis (3) After the calibration and straightening is completed, loosen the hook of the crane to lift the pile, lift the hydraulic impact piling hammer, and put the pile top steel cap at the lower end of the hammer head into the pile top; (4) Put the pile top into After that, carry out pile driving construction, observe the verticality of the pile sinking at any time during the driving process, control the sheet pile to maintain vertical pile sinking through the centralizing device, and check the verticality of each direction every 0.4 meters of pile sinking; (5) Design the distance between sinking pile and pile top When the elevation is 1.9 meters, loosen the centralizing device and conti...
Embodiment 3
[0039] Example 3: (1) Use a crane to lift the sheet pile vertically to the pile position for preliminary positioning, and use the sheet pile’s own weight to insert into the soil layer; (2) Use the erecting device to clamp the sheet pile body, adjust the verticality and adjust the construction axis (3) After the calibration and straightening is completed, loosen the hook of the crane to lift the pile, lift the hydraulic impact piling hammer, and put the pile top steel cap at the lower end of the hammer head into the pile top; (4) Put the pile top into After that, carry out pile driving construction, observe the verticality of the pile sinking at any time during the driving process, control the sheet pile to maintain vertical pile sinking through the centralizing device, and check the verticality of each direction every 0.6 meters of pile sinking; (5) Design the distance between sinking pile and pile top When the elevation is 2.1 meters, loosen the centralizing device and continu...