Tool and method for live replacement of straight line insulators of UHV grounding pole lines
A linear insulator, live replacement technology, applied in the direction of overhead line/cable equipment, etc., can solve the problem of wire connecting plate shaking left and right, wire sliding, etc., to improve work efficiency, save renovation costs, and improve stability.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] Such as figure 1 As shown, the tool in the present invention includes a base 3 at the cross arm, a lead screw 1, a lead screw handle 2, an insulating pull rod 4 and double hooks, the lead screw handle 2 is arranged on the lead screw, and the base 3 at the cross arm is fixed Set on the lower end of the screw handle 2 on the lead screw 1, one end of the insulating pull rod 4 is fixedly connected with one end of the lead screw 1 through a bolt, the other end of the insulating pull rod 4 is fixedly connected with the double hook 6 through a bolt, and the insulating pull rod The effective insulation length of 4 is not less than 0.6m; this tool also includes a supporting plate device 5, which includes a socket part 51, a connecting part 52 and a V-shaped support seat 53, and the socket part 51, connecting part 52 and V Type support base 53 is welded together, and supporting plate device 5 is fixedly socketed on the lower end of insulating pull rod 4 through socket part 51, an...
Embodiment 2
[0041] The difference between this embodiment and Embodiment 1 is that the anti-slip portion 61 of the wire support groove is made of patterned steel, and the pattern steel is machined onto the surface of the wire support groove.
[0042] The working principle of this embodiment is the same as that of Embodiment 1.
[0043] Based on the tools described in the above embodiments, the method for live replacement of the straight line insulator of the UHV grounding electrode line includes the following steps:
[0044] Step 1) No. 1 electrician 7 and No. 2 electrician 11 wear insulating protective equipment on the ground. No. 1 electrician 7 carries the insulating transmission rope to climb up the pole tower 12, and fastens the safety belt at the working position of cross arm 8; No. 2 electrician 11 carries a small The tool is mounted on the pole tower 12, climbed to the horizontal position of the pole tower 12 and the conductor, fastened the safety belt, and the positional relation...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


