Fixed installation structure and method for pre-buried channel in mine digging method trolley

A technology of pre-embedded channels and installation structures, which is applied in mining equipment, tunnels, tunnel linings, etc., and can solve problems such as the inability to ensure that the pre-embedded positions of the channels are accurate, the position of the channels is not easy to adjust, and it is not easy to find the channels. Achieve the effect of convenient use, simple installation and simplified installation steps

Inactive Publication Date: 2016-02-24
SICHUAN ZHONGHAO ENTREPRENEURSHIP HIGH SPEED RAIL NEW TECH DEV CO LTD
View PDF6 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The existing fixed pre-buried channel technology is to use binding wires or directly open holes on the formwork to fix the channels. The technical disadvantage of using binding wires is that after the channels are fixed on the steel mesh with binding wires, the position of the channels is not easy to adjust. Ensure the accuracy of the pre-embedded position of the channel; the technical disadvantage of directly opening a hole on the formwork to fix the channel is that the formwork only has one positioning hole, it is not easy to find the channel, and there is no way to stop the slurry

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fixed installation structure and method for pre-buried channel in mine digging method trolley
  • Fixed installation structure and method for pre-buried channel in mine digging method trolley
  • Fixed installation structure and method for pre-buried channel in mine digging method trolley

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention.

[0026] refer to Figure 1-8 , a fixed installation structure for the pre-embedded channel on the mining excavation trolley, including the pre-embedded channel 1, the trolley formwork 2, and three positioning holes 3 are opened horizontally at the points of the pre-embedded channel on the trolley formwork 2 , the positioning nut 4 is welded on the inside of the positioning hole 3 of the trolley template 2, the positioning nut 4 is provided with a U-shaped groove 11 inside, the T-shaped bolt 5 is connected with the pre-embedded groove crossing through the T-shaped bolt head, and the tail end passes through the trolley template 2, the positioning hole 3 and the position...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a fixed installation structure and method for a pre-buried channel in a mine digging method trolley. The fixed installation structure for the pre-buried channel in the mine digging method trolley comprises the channel, a trolley template, positioning nuts, T-shaped bolts, grout stopping insertion pieces and anchor rods. The anchor rods are installed on the back of the channel, positioning holes are formed in the trolley template, the positioning nuts are welded to the trolley template, U-shaped grooves are formed in the positioning nuts, the T-shaped bolts penetrate through the positioning nuts and the positioning holes in the trolley template, the grout stopping insertion pieces are inserted into the trolley template through the U-shaped grooves in the positioning nuts and the positioning holes, grout stopping plugs are arranged on the grout stopping insertion pieces, the grout stopping insertion pieces plug the positioning holes in the trolley template through the grout stopping plugs, and the anchor rods on the back of the channel are fixed to rebars through insulating binding wires. The fixed installation structure and method are convenient to use, installation is simple, and installation steps are simplified.

Description

technical field [0001] The invention relates to the technical field of channel installation methods, in particular to a structure and method for fixing and installing a pre-buried channel on a mining trolley. Background technique [0002] The pre-buried channel can be used in subway, high-speed rail, intercity and other urban rail transit projects, and can also be used in housing construction, water conservancy and hydropower, nuclear power, comprehensive pipe gallery and other projects; the application of pre-buried channel technology, the way of pre-buried channel Instead of the traditional way of chemical anchor bolts and metal brackets, it can greatly facilitate the installation of equipment and pipelines in the later stage, making the layout of equipment and pipelines convenient and flexible, greatly improving the on-site installation and construction environment, and can efficiently improve the installation work efficiency and shorten the construction period. And it ca...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D11/10E21F17/02
Inventor 凌敏
Owner SICHUAN ZHONGHAO ENTREPRENEURSHIP HIGH SPEED RAIL NEW TECH DEV CO LTD