A technology of underground diaphragm wall and high-pressure rotary jetting pile, applied in sheet pile wall, foundation structure engineering, construction, etc., can solve the problems of low stability of concrete pile structure, high equipment damage rate, long construction period, etc. The effect of low, low equipment damage rate and short construction period

Inactive Publication Date: 2016-03-30
YELLOW RIVER CONSERVATION GRP CO LTD
View PDF4 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The concrete piles built by the construction method of the existing underground diaphragm wall enclosure piles in the sluice chamber generally have low structural stability, high equipment damage rate during construction, long construction period and high cost. Therefore, there is an urgent need for a construction method to solve the above problems

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] The principles and features of the present invention are described below, and the examples given are only used to explain the present invention, and are not intended to limit the scope of the present invention.

[0020] A construction method of a high-pressure rotary grouting pile enclosed by an underground diaphragm wall of a sluice chamber, comprising the following steps:

[0021] Step 1. Stake out the pile position. According to the control point of the wire and the pile position layout diagram of the design drawing, after completing the stakeout of the sideline of the lock chamber, the distance is determined to determine the pile position, and each pile position is inserted with a wooden pile and sprinkled with white ash for marking;

[0022] Step 2, positioning the drilling rig, moving the pile driver to the marked position of one of the wooden piles, aligning the center of the drill bit with the pile position, and leveling the drilling rig after the drilling rig is...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the field of hydraulic engineering construction, in particular to a construction method of a lock chamber underground continuous wall enclosed high pressure jet grouting pile of a lock chamber. The construction method is characterized by comprising the following steps: step 1, pile lofting; step 2, drilling machine positioning; step 3, grout preparing; step 4, drilling and reaming; step 5, jet grouting accelerating; step 6, drilling machine shifting; and step 7, washing. The construction method has the beneficial effects that the underground continuous wall enclosure structure is high in stability, the equipment damage rate is low, the construction period is short, and the cost is low.

Description

technical field [0001] The invention relates to the field of hydraulic engineering construction, in particular to a construction method for high-pressure rotary grouting piles enclosed by an underground diaphragm wall of a sluice chamber. Background technique [0002] The concrete piles built by the construction method of the existing underground diaphragm wall enclosure piles in the sluice chamber generally have low structural stability, high equipment damage rate during construction, long construction period and high cost. Therefore, there is an urgent need for a construction method to Solve the above problems. Contents of the invention [0003] The technical problem to be solved by the present invention is to provide a construction method of high-pressure rotary grouting piles enclosed by an underground diaphragm wall of a sluice chamber with high pile structure stability, low equipment damage rate, short construction period and low cost. [0004] The technical solutio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D5/46
CPCE02D5/46
Inventor 张继宇都意王昊佀传铭周灵杰徐宝强尹志凯刘国章郑浩赵广福
Owner YELLOW RIVER CONSERVATION GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products