Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Ground treatment method when there is residual old pile foundation during building construction

A foundation treatment and building technology, applied in construction, soil protection, infrastructure engineering, etc., can solve the problems of uneven foundation settlement, increase engineering investment, increase construction difficulty, etc., to reduce construction difficulty, save engineering investment, Effect of preventing uneven settlement

Active Publication Date: 2017-10-03
鞍钢集团工程技术有限公司
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

When the old foundation is a concrete independent foundation or block foundation, it is easy to remove because the buried depth of the independent foundation or block foundation is shallow; but when the old foundation is a pile foundation, it is very difficult to remove because the pile is inserted deeply into the foundation soil
Usually the remaining old piles are not under the foundation of the whole building (such as figure 1 As shown), if the old piles are cut off and the new foundation construction is directly carried out on them, because there are piles under the partial foundation, the foundation of the building will have uneven settlement; if all the old piles are removed, the construction difficulty will be greatly increased , will not only extend the construction period, but also greatly increase the project investment

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Ground treatment method when there is residual old pile foundation during building construction
  • Ground treatment method when there is residual old pile foundation during building construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] The specific embodiment of the present invention will be further described below in conjunction with accompanying drawing:

[0018] Such as figure 2 Shown, the foundation treatment method when running into residual old pile foundation when building construction of the present invention, comprises the steps:

[0019] 1) Based on the bottom surface of the new foundation 4, over-excavate downwards and on both sides. The over-excavation depth is the thickness of the backfilled gravel layer 2 (marked as Z in the figure), and the thickness of the backfilled gravel layer 2 is not less than 1 meter (in the relevant Determined within the scope specified by the national standard), the over-excavation width is the width of the newly built foundation 4 (marked as b in the figure) + 2tan30° × the thickness of the backfill gravel layer 2;

[0020] 2) Excavating the old pile foundation exposed after over-excavation with a concrete chisel machine, and removing the exposed steel bars ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a foundation treatment method adopted when an old residual pile foundation exists during building construction. The method comprises the steps that 1, a newly-built foundation bottom face is adopted as a base, and overexcavation is carried out towards the lower portion and the two sides; 2, the old pile foundation exposed after overexcavation is chiseled away through a concrete chiseling machine, and exposed steel bars in an old pile are cut away through electrical welding; 3, after the ground obtained after overexcavation is leveled, gravel refilling is carried out, graded gravel with the maximum particle size of 50 mm is adopted for refilling, refilling gravel layers are ground by a vibrating roller layer by layer, the thickness of each layer is 200-300 mm, and the degree of compaction of the refilling gravel layers is not smaller than 0.97; 4, foundation pad layers are laid on the refilling gravel layers, and the strength grade of concrete is not lower than C10; and 5, newly-built foundation construction is carried out above the foundation pad layers. Under the condition of meeting foundation bearing capacity, the functions of adjusting the foundation bearing state and preventing differential settlement through an artificial mattress formed by the refilling gravel layers are achieved; and by means of the structure, construction difficulty can be greatly lowered, the construction progress can be accelerated, and a large amount of project investment can be saved.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a foundation treatment method when old pile foundations remain during building construction. Background technique [0002] In the process of rebuilding the old factory area, it is often encountered that the old building (structure) foundation remains in the building foundation. In the construction of the new building foundation, the usual practice is to remove all the old foundation first. When the old foundation is a concrete independent foundation or block foundation, it is easy to remove because the independent foundation or block foundation is buried shallow; but when the old foundation is a pile foundation, it is very difficult to remove because the pile is inserted deeply into the foundation soil. Usually the remaining old piles are not under the foundation of the whole building (such as figure 1 As shown), if the old piles are cut off and the new foundation ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D3/08
CPCE02D3/08
Inventor 曹素清于健喆王远志
Owner 鞍钢集团工程技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products